X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816012016002

Well Details

Well ID: 0816012016002
Loading map...
Location: 00/16-20-081-01W6/2
Location Alias: 00/16-20-81-01 W6M
Location Alias 2: 00/16-20-081-01 W6/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 20
County/Municipality: Municipal District of Fairview No. 136
Well Name: PETRUS WHITELAW 16-20-81-1
Operator Name: Tallahassee Exploration Inc.
License Number: 0221659
License Date: 1999-02-22
License Status: Issued
Spud Date: 1999-02-25
Final Drill Date: 1999-02-27
Well Total Depth: 1030.00 m
Surface Hole Latitude: 56.040667
Surface Hole Longitude: -118.110066

For data sources see[1][2]

Well History

Date Event
1999-02-22 Obtained License
1999-02-26 Surface Casing Operation Performed
1999-02-27 Finished Drilling
1999-02-27 Well Log Performed
1999-02-27 Well Mode changed to Drilled and Cased
1999-02-28 Well Log Performed
1999-03-01 Drill Stem Test Performed
1999-03-02 Production Casing Operation Performed
1999-03-02 Rig Released
1999-03-07 Well Log Performed
1999-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-08 Perforation Treatment Performed - Jet Perforation
1999-03-08 Plug Back Performed
1999-03-08 Well Log Performed
1999-03-09 Perforation Treatment Performed - Jet Perforation
1999-03-09 Well Log Performed
1999-03-10 Perforation Treatment Performed - Jet Perforation
1999-03-28 Drill Stem Test Performed
1999-04-01 Well Began Production
1999-04-01 Well Fluid changed to Gas
1999-04-01 Well Mode changed to Flowing
1999-05-23 Perforation Treatment Performed - Jet Perforation
2001-10-01 Well Fluid changed to Gas
2001-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-08 Perforation 974.00 974.20 2
1999-03-08 Packing Device Capped w/Cement 963.00 971.00 0
1999-03-09 Perforation 888.00 890.00 13
1999-03-09 Perforation 891.00 893.00 13
1999-03-09 Perforation 899.00 901.00 13
1999-03-10 Perforation 868.00 870.00 13
1999-05-23 Perforation 863.00 865.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 344 0.0 0.0 0.0

For data sources see[5]

References