X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816011314000

Well Details

Well ID: 0816011314000
Loading map...
Location: 00/14-13-081-01W6/0
Location Alias: 00/14-13-81-01 W6M
Location Alias 2: 00/14-13-081-01 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 13
County/Municipality: Municipal District of Fairview No. 136
Well Name: ADAMANT WHLAW 14-13-81-1
Operator Name: Long Run Exploration Ltd.
License Number: 0168712
License Date: 1994-07-15
License Status: Suspension
Spud Date: 1994-07-22
Final Drill Date: 1994-07-28
Well Total Depth: 1192.00 m
Surface Hole Latitude: 56.026396
Surface Hole Longitude: -118.014154

For data sources see[1][2]

Well History

Date Event
1994-07-15 Obtained License
1994-07-22 Well Log Performed
1994-07-24 Surface Casing Operation Performed
1994-07-28 Finished Drilling
1994-07-28 Well Log Performed
1994-07-28 Well Mode changed to Drilled and Cased
1994-07-29 Drill Stem Test Performed
1994-07-30 Drill Stem Test Performed
1994-07-31 Production Casing Operation Performed
1994-07-31 Rig Released
1994-09-03 Perforation Treatment Performed - Jet Perforation
1994-09-03 Well Log Performed
1994-09-04 Perforation Treatment Performed - Jet Perforation
1994-09-04 Well Log Performed
1994-12-23 Well Began Production
1994-12-23 Well Fluid changed to Gas
1994-12-23 Well Mode changed to Flowing
1995-06-27 Well Fluid changed to Gas
1995-06-27 Well Mode changed to Flowing
1995-10-03 Well Log Performed
1995-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-04 Plug Back Performed
1995-10-04 Well Fluid changed to Gas
1995-10-04 Well Mode changed to Abandoned Zone
1995-10-05 Perforation Treatment Performed - Jet Perforation
1995-10-05 Well Log Performed
1999-08-24 Well Log Performed
1999-08-25 Well Log Performed
1999-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-26 Plug Back Performed
1999-08-26 Well Log Performed
1999-08-27 Perforation Treatment Performed - Jet Perforation
1999-08-31 Well Log Performed
1999-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-01 Plug Back Performed
1999-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-20 Plug Back Performed
2011-09-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-03 Perforation 941.00 943.00 14
1999-09-03 Acid Treatment 410.00 411.00 0
2011-09-20 Packing Device Capped w/Cement 390.00 398.00 0
1994-09-04 Perforation 825.00 828.50 18
1995-10-04 Packing Device Capped w/Cement 927.00 935.00 0
1995-10-05 Perforation 805.50 807.00 14
1999-08-26 Packing Device Capped w/Cement 813.00 821.00 0
1999-08-26 Packing Device Capped w/Cement 792.00 800.00 0
1999-08-27 Perforation 410.00 411.00 20
1999-08-27 Perforation 570.00 571.00 20
1999-09-01 Packing Device Capped w/Cement 540.00 548.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 206 0.0 0.0 0.0
1995 4272 0.0 0.0 0.0

For data sources see[5]

References