X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815153014000

Well Details

Well ID: 0815153014000
Loading map...
Location: 00/14-30-081-15W5/0
Location Alias: 00/14-30-81-15 W5M
Location Alias 2: 00/14-30-081-15 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 15
Section: 30
County/Municipality: Northern Sunrise County
Well Name: NRI DAWSON 14-30-81-15
Operator Name: Summerland Energy Inc.
License Number: 0113718
License Date: 1985-03-01
License Status: Issued
Spud Date: 1985-03-20
Final Drill Date: 1985-04-06
Well Total Depth: 2013.00 m
Surface Hole Latitude: 56.056009
Surface Hole Longitude: -116.340600

For data sources see[1][2]

Well History

Date Event
1985-03-01 Obtained License
1985-03-21 Surface Casing Operation Performed
1985-03-23 Direction Drilling Operation Performed - Deviate
1985-04-06 Finished Drilling
1985-04-06 Well Log Performed
1985-04-06 Well Mode changed to Drilled and Cased
1985-04-07 Production Casing Operation Performed
1985-04-08 Rig Released
1985-08-03 Perforation Treatment Performed - Jet Perforation
1985-08-10 Well Began Production
1985-08-10 Well Fluid changed to Crude Oil
1985-08-10 Well Mode changed to Pumping
1985-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-06 Well Log Performed
1989-07-24 Well Fluid changed to Crude Oil
1989-07-24 Well Mode changed to Suspended
1995-09-13 Well Fluid changed to Crude Oil
1995-09-13 Well Mode changed to Pumping
2008-02-01 Well Fluid changed to Crude Oil
2008-02-01 Well Mode changed to Suspended
2008-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-07 Plug Back Performed
2008-11-07 Well Fluid changed to Crude Oil
2008-11-07 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-03-23 333.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-03 Perforation 1969.00 1971.70 13
1985-08-17 Acid Treatment 1969.00 1971.70 0
2008-11-07 Packing Device Capped w/Cement 1954.00 1962.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1300 0.0 0.0 0.0
1986 1933 0.0 0.0 0.0
1987 1928 0.0 0.0 0.0
1988 5574 0.0 0.0 0.0
1989 3895 0.0 0.0 0.0
1994 582 0.0 0.0 0.0
1995 2401 0.0 0.0 0.0
1996 4673 0.0 0.0 0.0
1997 4600 0.0 0.0 0.0
1999 1712 0.0 0.0 0.0
2000 7074 0.0 0.0 0.0
2001 5662 0.0 0.0 0.0
2002 6897 0.0 0.0 0.0
2003 1474 0.0 0.0 0.0

For data sources see[6]

References