X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815100311002

Well Details

Well ID: 0815100311002
Loading map...
Location: 00/11-03-081-10W5/2
Location Alias: 00/11-03-81-10 W5M
Location Alias 2: 00/11-03-081-10 W5/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 10
Section: 03
County/Municipality: Northern Sunrise County
Well Name: ELAN UTIKUMA 11-3-81-10
Operator Name: Canadian Natural Resources Limited
License Number: 0131804
License Date: 1988-01-29
License Status: Abandoned
Spud Date: 1988-02-03
Final Drill Date: 1988-03-09
Well Total Depth: 1821.00 m
Surface Hole Latitude: 55.995067
Surface Hole Longitude: -115.478292

For data sources see[1][2]

Well History

Date Event
1988-01-29 Obtained License
1988-02-05 Surface Casing Operation Performed
1988-02-25 Direction Drilling Operation Performed - Sidetrack Fish
1988-03-09 Finished Drilling
1988-03-09 Well Mode changed to Drilled and Cased
1988-03-10 Well Log Performed
1988-03-11 Drill Stem Test Performed
1988-03-13 Production Casing Operation Performed
1988-03-13 Rig Released
1988-04-03 Perforation Treatment Performed - Jet Perforation
1988-04-03 Well Began Production
1988-04-03 Well Fluid changed to Crude Oil
1988-04-03 Well Mode changed to Pumping
1988-05-12 Well Log Performed
1989-09-30 Well Fluid changed to Crude Oil
1989-09-30 Well Mode changed to Suspended
1996-10-26 Well Fluid changed to Crude Oil
1996-10-26 Well Mode changed to Pumping
1999-06-05 Well Log Performed
1999-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-06 Plug Back Performed
1999-06-06 Well Fluid changed to Crude Oil
1999-06-06 Well Mode changed to Abandoned Zone
1999-06-08 Perforation Treatment Performed - Jet Perforation
1999-06-09 Perforation Treatment Performed - Jet Perforation
1999-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-11 Perforation Treatment Performed - Cement Squeeze
1999-06-12 Perforation Treatment Performed - Jet Perforation
1999-06-13 Perforation Treatment Performed - Remedial Casing
1999-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-15 Well Abandoned
1999-06-15 Well Fluid changed to Crude Oil
1999-06-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-02-25 1096.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-03 Perforation 1788.30 1790.20 13
1999-06-14 Packing Device Capped w/Cement 389.70 440.20 0
1988-04-03 Perforation 1791.60 1794.00 13
1999-06-06 Packing Device Capped w/Cement 1777.00 1785.00 0
1999-06-08 Perforation 617.00 618.00 14
1999-06-09 Perforation 636.00 637.00 17
1999-06-11 Cement Squeeze 617.00 637.00 0
1999-06-11 Packing Device Capped w/Cement 582.50 627.00 0
1999-06-12 Perforation 450.00 451.00 17
1999-06-13 Remedial Casing Cementing 450.00 451.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5133 0.0 0.0 0.0
1989 3527 0.0 0.0 0.0
1996 1434 0.0 0.0 0.0
1997 232 0.0 0.0 0.0

For data sources see[6]

References