X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815090308000

Well Details

Well ID: 0815090308000
Loading map...
Location: 00/08-03-081-09W5/0
Location Alias: 00/08-03-81-09 W5M
Location Alias 2: 00/08-03-081-09 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 09
Section: 03
County/Municipality: Northern Sunrise County
Well Name: AMOCO NIPISI 8-3-81-9
Operator Name: Canadian Natural Resources Limited
License Number: 0066191
License Date: 1977-10-18
License Status: Suspension
Spud Date: 1978-01-05
Final Drill Date: 1978-02-05
Well Total Depth: 1770.00 m
Surface Hole Latitude: 55.989868
Surface Hole Longitude: -115.310477

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-18 Obtained License
1978-01-05 Lost Circulation Occurred
1978-01-17 Kick Occurred
1978-02-05 Finished Drilling
1978-02-05 Well Mode changed to Drilled and Cased
1978-02-06 Drill Stem Test Performed
1978-02-08 Production Casing Operation Performed
1978-03-07 Perforation Treatment Performed - Jet Perforation
1978-03-27 Well Began Production
1978-03-27 Well Fluid changed to Crude Oil
1978-03-27 Well Mode changed to Flowing
1978-07-23 Well Fluid changed to Crude Oil
1978-07-23 Well Mode changed to Pumping
1990-07-22 Perforation Treatment Performed - Jet Perforation
1990-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-06 Well Log Performed
1995-03-09 Perforation Treatment Performed - Cement Squeeze
1995-03-14 Perforation Treatment Performed - Jet Perforation
2014-09-30 Well Fluid changed to Crude Oil
2014-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-07 Perforation 1742.50 1744.10 13
1978-03-07 Perforation 1746.20 1747.70 13
1990-07-22 Perforation 1742.20 1744.10 13
1990-07-22 Perforation 1744.60 1747.70 13
1990-07-23 Acid Treatment 1742.20 1747.70 0
1995-03-09 Cement Squeeze 1742.20 1747.70 0
1995-03-14 Perforation 1741.60 1743.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 870 0.0 0.0 0.0
1979 2016 0.0 0.0 0.0
1980 2064 0.0 0.0 0.0
1981 2784 0.0 0.0 0.0
1982 2992 0.0 0.0 0.0
1983 3768 0.0 0.0 0.0
1984 6228 0.0 0.0 0.0
1985 7480 0.0 0.0 0.0
1986 7665 0.0 0.0 0.0
1987 7919 0.0 0.0 0.0
1988 6549 0.0 0.0 0.0
1989 7245 0.0 0.0 0.0
1990 8041 0.0 0.0 0.0
1991 8492 0.0 0.0 0.0
1992 8479 0.0 0.0 0.0
1993 6732 0.0 0.0 0.0
1994 7368 0.0 0.0 0.0
1995 7674 0.0 0.0 0.0
1996 8120 0.0 0.0 0.0
1997 8319 0.0 0.0 0.0
1998 8099 0.0 0.0 0.0
1999 8047 0.0 0.0 0.0
2000 7863 0.0 0.0 0.0
2001 8603 0.0 0.0 0.0
2002 8626 0.0 0.0 0.0
2003 8124 0.0 0.0 0.0
2004 7898 0.0 0.0 0.0
2005 6938 0.0 0.0 0.0
2006 6513 0.0 0.0 0.0
2007 8031 0.0 0.0 0.0
2008 8554 0.0 0.0 0.0
2009 8164 0.0 0.0 0.0
2010 8223 0.0 0.0 0.0
2011 7561 0.0 0.0 0.0
2012 8181 0.0 0.0 0.0
2013 4139 0.0 0.0 0.0
2014 570 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-01-05 Lost Circulation 68.30 68.30
1978-01-17 Kick 1138.40 1138.40

For data sources see[6]

References