X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815081716000

Well Details

Well ID: 0815081716000
Loading map...
Location: 00/16-17-081-08W5/0
Location Alias: 00/16-17-81-08 W5M
Location Alias 2: 00/16-17-081-08 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 08
Section: 17
County/Municipality: Northern Sunrise County
Well Name: CELTIC NIPISI 16-17-81-8
Operator Name: XTO Energy Canada ULC
License Number: 0085805
License Date: 1980-09-22
License Status: Abandoned
Spud Date: 1980-10-02
Final Drill Date: 1980-10-19
Well Total Depth: 1780.00 m
Surface Hole Latitude: 56.026099
Surface Hole Longitude: -115.207656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-22 Obtained License
1980-10-19 Finished Drilling
1980-10-19 Well Log Performed
1980-10-19 Well Mode changed to Drilled and Cased
1980-10-20 Drill Stem Test Performed
1980-10-22 Drill Stem Test Performed
1980-10-24 Drill Stem Test Performed
1980-10-25 Production Casing Operation Performed
1980-11-20 Perforation Treatment Performed - Jet Perforation
1980-11-21 Well Began Production
1980-11-21 Well Fluid changed to Crude Oil
1980-11-21 Well Mode changed to Flowing
1991-03-22 Well Fluid changed to Crude Oil
1991-03-22 Well Mode changed to Pumping
1992-11-01 Well Fluid changed to Crude Oil
1992-11-01 Well Mode changed to Suspended
2001-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-07 Plug Back Performed
2001-03-07 Well Fluid changed to Crude Oil
2001-03-07 Well Mode changed to Abandoned Zone
2003-12-08 Perforation Treatment Performed - Jet Perforation
2004-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-08-28 Perforation Treatment Performed - Jet Perforation
2015-08-29 Perforation Treatment Performed - Jet Perforation
2015-08-30 Perforation Treatment Performed - Cement Plug
2015-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-31 Perforation Treatment Performed - Cement Plug
2015-08-31 Perforation Treatment Performed - Cement Squeeze
2015-08-31 Plug Back Performed
2015-09-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-20 Perforation 1749.00 1751.00 10
2015-08-30 Cement Plug 1211.00 1657.80 0
2015-08-30 Cement Plug 801.40 1211.50 0
2015-08-30 Cement Plug 578.80 801.40 0
2015-08-31 Cement Squeeze 190.00 555.00 0
2015-08-31 Cement Plug 193.00 578.80 0
2015-08-31 Packing Device Capped w/Cement 164.00 184.70 0
2001-03-07 Packing Device Capped w/Cement 1737.00 1745.00 0
2003-12-08 Perforation 1664.00 1668.50 14
2004-01-15 Acid Treatment 1664.00 1668.50 0
2015-08-28 Perforation 789.00 790.00 21
2015-08-29 Perforation 190.00 191.00 21
2015-08-29 Perforation 554.00 555.00 21
2015-08-29 Perforation 358.00 359.00 21
2015-08-29 Perforation 315.00 316.00 21

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 352 0.0 0.0 0.0
1981 5015 0.0 0.0 0.0
1982 5989 0.0 0.0 0.0
1983 8532 0.0 0.0 0.0
1984 8479 0.0 0.0 0.0
1985 8419 0.0 0.0 0.0
1986 8619 0.0 0.0 0.0
1987 8568 0.0 0.0 0.0
1988 8736 0.0 0.0 0.0
1989 7944 0.0 0.0 0.0
1990 8712 0.0 0.0 0.0
1991 5760 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References