X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815023607000

Well Details

Well ID: 0815023607000
Loading map...
Location: 00/07-36-081-02W5/0
Location Alias: 00/07-36-81-02 W5M
Location Alias 2: 00/07-36-081-02 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 02
Section: 36
County/Municipality: Municipal District of Opportunity No. 17
Well Name: HB GODIN 7-36-81-2
Operator Name: BP Canada Energy Group ULC
License Number: 0068002
License Date: 1978-01-20
License Status: RecCertified
Spud Date: 1978-02-22
Final Drill Date: 1978-03-02
Well Total Depth: 487.70 m
Surface Hole Latitude: 56.062415
Surface Hole Longitude: -114.169503

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-01-20 Obtained License
1978-02-22 Lost Circulation Occurred
1978-03-01 Production Casing Operation Performed
1978-03-02 Finished Drilling
1978-03-02 Perforation Treatment Performed - Open-Hole Completion
1978-03-04 Drill Stem Test Performed
1978-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-18 Perforation Treatment Performed - Cement Squeeze
1978-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-03-20 Perforation Treatment Performed - Open-Hole Completion
1978-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1978-03-21 Well Mode changed to Drilled and Cased
1978-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-03-23 Perforation Treatment Performed - Jet Perforation
1978-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-12-13 Perforation Treatment Performed - Jet Perforation
1978-12-14 Well Abandoned
1978-12-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-02 Open Hole/Barefoot Completion 457.80 487.70 0
1978-12-13 Packing Device Capped w/Cement 205.70 213.30 0
1978-03-17 Acid Treatment 457.80 487.70 0
1978-03-18 Cement Squeeze 466.60 487.70 0
1978-03-20 Packing Device Capped w/Cement 464.80 466.60 0
1978-03-20 Open Hole/Barefoot Completion 457.80 464.80 0
1978-03-21 Acid Wash 457.80 464.80 0
1978-03-23 Perforation 463.00 464.80 14
1978-03-23 Packing Device Capped w/Cement 442.00 450.00 0
1978-12-13 Perforation 222.50 224.00 14

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-02-22 Lost Circulation 8.80 18.30

For data sources see[5]

References