X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806121501000

Well Details

Well ID: 0806121501000
Loading map...
Location: 00/01-15-080-12W6/0
Location Alias: 00/01-15-80-12 W6M
Location Alias 2: 00/01-15-080-12 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 12
Section: 15
County/Municipality: Saddle Hills County
Well Name: STAR ET AL POUCE 1-15-80-12
Operator Name: ARC Resources Ltd.
License Number: 0207320
License Date: 1997-10-17
License Status: Abandoned
Spud Date: 1997-10-18
Final Drill Date: 1997-10-30
Well Total Depth: 1707.00 m
Surface Hole Latitude: 55.930332
Surface Hole Longitude: -119.781621

For data sources see[1][2]

Well History

Date Event
1997-10-10 Well Log Performed
1997-10-17 Obtained License
1997-10-21 Surface Casing Operation Performed
1997-10-30 Drill Stem Test Performed
1997-10-30 Finished Drilling
1997-10-30 Well Log Performed
1997-10-30 Well Mode changed to Drilled and Cased
1997-10-31 Drill Stem Test Performed
1997-11-01 Production Casing Operation Performed
1997-11-02 Rig Released
1997-11-13 Well Log Performed
1997-11-17 Perforation Treatment Performed - Jet Perforation
1997-11-17 Well Log Performed
1997-11-26 Perforation Treatment Performed - Fractured
1998-07-30 Well Began Production
1998-07-30 Well Fluid changed to Gas
1998-07-30 Well Mode changed to Flowing
2005-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-26 Plug Back Performed
2005-06-26 Well Fluid changed to Gas
2005-06-26 Well Mode changed to Abandoned Zone
2005-06-27 Perforation Treatment Performed - Jet Perforation
2005-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-06-21 Well Log Performed
2010-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-08 Plug Back Performed
2010-01-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-17 Perforation 1683.00 1686.50 17
1997-11-26 Fracture 1683.00 1686.50 0
2005-06-26 Packing Device Capped w/Cement 1666.50 1674.50 0
2005-06-27 Perforation 1471.00 1475.50 17
2005-06-29 Acid Treatment 1471.00 1475.50 0
2010-01-08 Packing Device Capped w/Cement 1457.00 1465.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2243 0.0 0.0 0.0
1999 7942 0.0 0.0 0.0
2000 8123 0.0 0.0 0.0
2001 6737 0.0 0.0 0.0
2002 675 0.0 0.0 0.0

For data sources see[5]

References