X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805243503000

Well Details

Well ID: 0805243503000
Loading map...
Location: 00/03-35-080-24W5/0
Location Alias: 00/03-35-80-24 W5M
Location Alias 2: 00/03-35-080-24 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 24
Section: 35
County/Municipality: Birch Hills County
Well Name: CNRL TANGENT 3-35-80-24
Operator Name: Canadian Natural Resources Limited
License Number: 0144266
License Date: 1990-05-28
License Status: Suspension
Spud Date: 1990-06-17
Final Drill Date: 1990-06-26
Well Total Depth: 1850.00 m
Surface Hole Latitude: 55.972265
Surface Hole Longitude: -117.645316

For data sources see[1][2]

Well History

Date Event
1990-05-28 Obtained License
1990-06-18 Surface Casing Operation Performed
1990-06-19 Lost Circulation Occurred
1990-06-26 Finished Drilling
1990-06-26 Well Log Performed
1990-06-26 Well Mode changed to Drilled and Cased
1990-06-27 Drill Stem Test Performed
1990-06-27 Well Log Performed
1990-06-29 Drill Stem Test Performed
1990-06-30 Drill Stem Test Performed
1990-07-04 Production Casing Operation Performed
1990-07-04 Rig Released
1990-07-13 Perforation Treatment Performed - Jet Perforation
1990-07-13 Well Log Performed
1990-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-16 Perforation Treatment Performed - Cement Squeeze
1990-07-17 Well Began Production
1990-07-17 Well Fluid changed to Crude Oil
1990-07-17 Well Mode changed to Flowing
1990-10-10 Well Log Performed
1990-10-22 Well Fluid changed to Crude Oil
1990-10-22 Well Mode changed to Pumping
1991-08-24 Perforation Treatment Performed - Jet Perforation
1991-08-24 Well Log Performed
1991-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-03 Well Log Performed
1997-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-04 Plug Back Performed
1997-06-04 Well Fluid changed to Crude Oil
1997-06-04 Well Mode changed to Abandoned Zone
1997-06-05 Well Log Performed
1997-06-06 Perforation Treatment Performed - Jet Perforation
2010-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-19 Perforation Treatment Performed - Cement Squeeze
2010-09-19 Plug Back Performed
2010-09-23 Perforation Treatment Performed - Jet Perforation
2010-09-24 Perforation Treatment Performed - Cement Plug
2010-09-24 Perforation Treatment Performed - Remedial Casing
2010-10-01 Perforation Treatment Performed - Jet Perforation
2010-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-02 Perforation Treatment Performed - Remedial Casing
2012-06-28 Perforation Treatment Performed - Jet Perforation
2012-06-28 Well Log Performed
2012-06-29 Perforation Treatment Performed - Cement Plug
2012-06-29 Perforation Treatment Performed - Remedial Casing
2013-01-17 Well Log Performed
2013-01-19 Perforation Treatment Performed - Jet Perforation
2013-01-19 Well Log Performed
2013-01-21 Well Log Performed
2013-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-22 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-07-13 Perforation 1803.00 1807.00 13
2010-09-19 Packing Device Capped w/Cement 1530.00 1560.00 0
2010-09-23 Perforation 1486.50 1488.50 20
2010-09-24 Remedial Casing Cementing 1486.50 1488.50 0
2010-09-24 Cement Plug 1453.90 1488.50 0
2010-10-01 Perforation 748.50 750.50 20
2010-10-02 Remedial Casing Cementing 748.50 750.50 0
2010-10-02 Packing Device Capped w/Cement 713.00 743.00 0
2012-06-28 Perforation 748.50 750.50 20
2012-06-28 Perforation 957.00 959.00 20
2012-06-29 Remedial Casing Cementing 957.00 959.00 0
1990-07-14 Acid Treatment 1803.00 1807.00 0
2012-06-29 Cement Plug 934.00 953.00 0
2013-01-19 Perforation 731.50 733.50 20
2013-01-22 Remedial Casing Cementing 731.50 733.50 0
2013-01-22 Packing Device Capped w/Cement 710.50 729.50 0
1990-07-16 Cement Squeeze 1803.00 1807.00 0
1991-08-24 Perforation 1746.00 1751.00 13
1991-08-25 Acid Treatment 1746.00 1751.00 0
1997-06-04 Packing Device Capped w/Cement 1732.00 1740.00 0
1997-06-06 Perforation 1569.00 1570.50 18
1997-06-06 Perforation 1573.00 1574.00 18
2010-09-19 Cement Squeeze 1569.00 1574.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3091 0.0 0.0 0.0
1991 6221 0.0 0.0 0.0
1992 8276 0.0 0.0 0.0
1993 7979 0.0 0.0 0.0
1994 7790 0.0 0.0 0.0
1995 8648 0.0 0.0 0.0
1996 8549 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-06-19 Lost Circulation 609.00 1710.00
2012-07-03 No Incident Encountered 0.00 0.00
2013-01-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References