If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0805242602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.958879,"lon":-117.636148,"icon":""}]} |
Location: 00/02-26-080-24W5/0 | |
Location Alias: 00/02-26-80-24 W5M | |
Location Alias 2: 00/02-26-080-24 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 5 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL ET AL TANGENT 2-26-80-24 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0141218 | |
License Date: 1989-10-10 | |
License Status: Suspension | |
Spud Date: 1989-10-10 | |
Final Drill Date: 1989-10-21 | |
Well Total Depth: 1885.00 m | |
Surface Hole Latitude: 55.958879 | |
Surface Hole Longitude: -117.636148 |
Date | Event |
---|---|
1989-10-10 | Obtained License |
1989-10-12 | Surface Casing Operation Performed |
1989-10-14 | Lost Circulation Occurred |
1989-10-21 | Finished Drilling |
1989-10-21 | Well Log Performed |
1989-10-22 | Drill Stem Test Performed |
1989-10-23 | Drill Stem Test Performed |
1989-10-26 | Production Casing Operation Performed |
1989-10-26 | Rig Released |
1989-10-26 | Well Mode changed to Drilled and Cased |
1989-11-08 | Well Log Performed |
1989-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-09 | Perforation Treatment Performed - Jet Perforation |
1989-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-13 | Well Began Production |
1989-11-13 | Well Fluid changed to Crude Oil |
1989-11-13 | Well Mode changed to Flowing |
1989-11-14 | Well Log Performed |
1989-11-15 | Perforation Treatment Performed - Jet Perforation |
1989-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-01-27 | Well Fluid changed to Crude Oil |
1990-01-27 | Well Mode changed to Pumping |
1990-12-16 | Perforation Treatment Performed - Jet Perforation |
1990-12-16 | Well Log Performed |
1990-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-11-19 | Well Log Performed |
1993-11-21 | Perforation Treatment Performed - Jet Perforation |
1993-11-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-11-25 | Well Log Performed |
1993-11-26 | Perforation Treatment Performed - Jet Perforation |
1993-11-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-08-01 | Well Fluid changed to Crude Oil |
1998-08-01 | Well Mode changed to Suspended |
2005-11-23 | Well Fluid changed to Crude Oil |
2005-11-23 | Well Mode changed to Pumping |
2015-06-30 | Well Fluid changed to Crude Oil |
2015-06-30 | Well Mode changed to Suspended |
2018-06-01 | Well Fluid changed to Crude Oil |
2018-06-01 | Well Mode changed to Pumping |
2019-06-30 | Well Fluid changed to Crude Oil |
2019-06-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-11-09 | Perforation | 1787.00 | 1794.00 | 13 |
1993-11-24 | Acid Treatment | 1758.00 | 1761.00 | 0 |
1993-11-26 | Perforation | 1751.50 | 1755.00 | 14 |
1993-11-28 | Acid Treatment | 1751.50 | 1755.00 | 0 |
1989-11-09 | Acid Treatment | 1787.00 | 1794.00 | 0 |
1989-11-12 | Acid Treatment | 1787.00 | 1794.00 | 0 |
1989-11-15 | Perforation | 1801.00 | 1808.00 | 13 |
1989-11-16 | Acid Treatment | 1801.00 | 1808.00 | 0 |
1990-12-16 | Perforation | 1769.00 | 1771.00 | 13 |
1990-12-16 | Perforation | 1774.00 | 1779.00 | 13 |
1990-12-17 | Acid Treatment | 1769.00 | 1779.00 | 0 |
1993-11-21 | Perforation | 1758.00 | 1761.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 757 | 0.0 | 0.0 | 0.0 |
1990 | 7214 | 0.0 | 0.0 | 0.0 |
1991 | 8545 | 0.0 | 0.0 | 0.0 |
1992 | 6920 | 0.0 | 0.0 | 0.0 |
1993 | 8336 | 0.0 | 0.0 | 0.0 |
1994 | 8678 | 0.0 | 0.0 | 0.0 |
1995 | 8646 | 0.0 | 0.0 | 0.0 |
1996 | 8618 | 0.0 | 0.0 | 0.0 |
1997 | 8685 | 0.0 | 0.0 | 0.0 |
1998 | 3598 | 0.0 | 0.0 | 0.0 |
2005 | 245 | 0.0 | 0.0 | 0.0 |
2007 | 346 | 0.0 | 0.0 | 0.0 |
2008 | 37 | 0.0 | 0.0 | 0.0 |
2010 | 343 | 0.0 | 0.0 | 0.0 |
2011 | 143 | 0.0 | 0.0 | 0.0 |
2014 | 471 | 0.0 | 0.0 | 0.0 |
2018 | 710 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-10-14 | Lost Circulation | 497.00 | 1722.00 |
For data sources see[6]