X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805242516020

Well Details

Well ID: 0805242516020
Loading map...
Location: 02/16-25-080-24W5/0
Location Alias: 02/16-25-80-24 W5M
Location Alias 2: 02/16-25-080-24 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 24
Section: 25
County/Municipality: Birch Hills County
Well Name: CNRL TANGENT 16-25-80-24
Operator Name: Canadian Natural Resources Limited
License Number: 0092834
License Date: 1981-10-20
License Status: Suspension
Spud Date: 1981-10-27
Final Drill Date: 1981-12-03
Well Total Depth: 2246.00 m
Surface Hole Latitude: 55.967394
Surface Hole Longitude: -117.608589

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-20 Obtained License
1981-11-06 Drill Stem Test Performed
1981-11-07 Liner Casing Operation Performed
1981-12-01 Drill Stem Test Performed
1981-12-03 Finished Drilling
1981-12-06 Drill Stem Test Performed
1981-12-07 Drill Stem Test Performed
1982-02-12 Perforation Treatment Performed - Open-Hole Completion
1982-02-13 Perforation Treatment Performed - Jet Perforation
1982-02-15 Perforation Treatment Performed - Fractured
1982-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-26 Well Mode changed to Drilled and Cased
1983-03-22 Perforation Treatment Performed - Jet Perforation
1983-03-23 Perforation Treatment Performed - Jet Perforation
1983-03-24 Perforation Treatment Performed - Cement Squeeze
1983-03-24 Perforation Treatment Performed - Open-Hole Completion
1983-03-24 Well Mode changed to Abandoned Zone
1983-05-20 Perforation Treatment Performed - Jet Perforation
1983-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-27 Perforation Treatment Performed - Jet Perforation
1983-05-28 Perforation Treatment Performed - Fractured
1983-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-14 Well Log Performed
1984-11-16 Perforation Treatment Performed - Jet Perforation
1984-11-16 Well Log Performed
1984-11-17 Perforation Treatment Performed - Fractured
1984-11-19 Well Log Performed
1984-11-21 Perforation Treatment Performed - Cement Squeeze
1984-11-21 Perforation Treatment Performed - Jet Perforation
1984-11-21 Well Log Performed
1984-11-23 Perforation Treatment Performed - Jet Perforation
1984-11-23 Well Log Performed
1984-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-27 Perforation Treatment Performed - Fractured
1984-11-27 Perforation Treatment Performed - Jet Perforation
1993-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-21 Perforation Treatment Performed - Cement Squeeze
1993-02-21 Perforation Treatment Performed - Jet Perforation
1993-02-25 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-12 Open Hole/Barefoot Completion 1089.00 1102.00 0
1982-02-13 Perforation 1072.50 1073.00 7
1982-02-13 Perforation 1077.20 1077.70 7
1982-02-13 Perforation 1092.30 1093.00 13
1982-02-15 Fracture 1023.00 1102.00 0
1982-02-17 Packing Device Capped w/Cement 1062.00 1070.00 0
1983-03-22 Perforation 1072.50 1073.00 7
1983-03-22 Perforation 1077.20 1077.70 7
1983-03-23 Perforation 1092.30 1093.00 13
1983-03-24 Open Hole/Barefoot Completion 1089.00 1988.00 0
1983-03-24 Cement Squeeze 1023.00 1988.00 0
1982-02-13 Perforation 1023.00 1025.50 7
1983-05-20 Perforation 1755.00 1757.00 7
1983-05-20 Perforation 1770.00 1771.00 7
1983-05-20 Perforation 1772.00 1774.00 7
1983-05-20 Perforation 1776.00 1777.00 7
1983-05-20 Perforation 1780.00 1782.00 7
1983-05-20 Perforation 1784.00 1786.00 7
1983-05-20 Perforation 1788.00 1789.00 7
1983-05-21 Acid Treatment 1755.00 1789.00 0
1983-05-27 Perforation 1753.00 1755.00 7
1983-05-28 Fracture 1753.00 1757.00 0
1982-02-13 Perforation 1031.70 1032.20 7
1983-05-30 Packing Device Capped w/Cement 1742.00 1750.00 0
1984-11-16 Perforation 753.00 757.00 13
1984-11-17 Fracture 753.00 757.00 0
1984-11-21 Perforation 764.50 765.00 13
1984-11-21 Cement Squeeze 764.50 765.00 0
1984-11-23 Perforation 753.00 757.00 13
1984-11-25 Acid Treatment 753.00 757.00 0
1984-11-27 Perforation 736.00 738.00 13
1984-11-27 Fracture 736.00 738.00 0
1993-02-21 Packing Device Capped w/Cement 742.00 750.00 0
1982-02-13 Perforation 1036.70 1037.30 7
1993-02-21 Packing Device Capped w/Cement 718.00 726.00 0
1993-02-21 Perforation 371.00 372.00 72
1993-02-21 Cement Squeeze 371.00 372.00 0
1993-02-25 Perforation 351.00 354.00 13
1982-02-13 Perforation 1039.50 1040.20 7
1982-02-13 Perforation 1042.00 1046.00 7
1982-02-13 Perforation 1050.00 1050.50 7
1982-02-13 Perforation 1051.30 1052.30 7
1982-02-13 Perforation 1056.00 1057.30 7

For data sources see[4]



References