X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805233106000

Well Details

Well ID: 0805233106000
Loading map...
Location: 00/06-31-080-23W5/0
Location Alias: 00/06-31-80-23 W5M
Location Alias 2: 00/06-31-080-23 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 31
County/Municipality: Birch Hills County
Well Name: INTERACTION PCP TANGENT 6-31-80-23
Operator Name: Obsidian Energy Ltd.
License Number: 0093584
License Date: 1981-11-27
License Status: Suspension
Spud Date: 1981-12-11
Final Drill Date: 1982-01-14
Well Total Depth: 1820.00 m
Surface Hole Latitude: 55.976538
Surface Hole Longitude: -117.591021

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-27 Obtained License
1982-01-02 Production Casing Operation Performed
1982-01-13 Drill Stem Test Performed
1982-01-14 Finished Drilling
1982-01-15 Drill Stem Test Performed
1982-02-26 Well Mode changed to Drilled and Cased
1982-10-17 Perforation Treatment Performed - Jet Perforation
1982-10-25 Well Mode changed to Drilled and Cased
1984-02-13 Well Began Production
1984-02-13 Well Fluid changed to Gas
1984-02-13 Well Mode changed to Flowing
1987-07-31 Well Fluid changed to Gas
1987-07-31 Well Mode changed to Suspended
1989-03-06 Perforation Treatment Performed - Cement Squeeze
1989-03-06 Plug Back Performed
1989-03-06 Well Fluid changed to Gas
1989-03-06 Well Mode changed to Abandoned Zone
1989-03-07 Well Log Performed
1989-03-09 Perforation Treatment Performed - Jet Perforation
1989-03-09 Well Log Performed
1989-03-11 Perforation Treatment Performed - Jet Perforation
1989-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-12 Perforation Treatment Performed - Chemical Squeeze
2001-10-15 Perforation Treatment Performed - Jet Perforation
2001-10-24 Well Log Performed
2001-10-26 Well Log Performed
2013-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-19 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-17 Perforation 727.00 729.00 7
2013-01-19 Packing Device Capped w/Cement 737.00 745.00 0
1989-03-06 Cement Squeeze 727.00 729.00 0
1989-03-09 Perforation 860.00 862.50 13
1989-03-11 Perforation 851.50 852.50 13
1989-03-12 Acid Treatment 851.50 852.50 0
2001-10-12 Chemical Squeeze 851.50 852.20 0
2001-10-15 Perforation 752.00 754.00 17
2001-10-15 Perforation 755.00 757.50 17
2013-01-19 Packing Device Capped w/Cement 837.00 845.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6482 0.0 0.0 0.0
1985 7603 0.0 0.0 0.0
1986 2833 0.0 0.0 0.0
1987 263 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References