X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805232911023

Well Details

Well ID: 0805232911023
Loading map...
Location: 02/11-29-080-23W5/3
Location Alias: 02/11-29-80-23 W5M
Location Alias 2: 02/11-29-080-23 W5/03
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 29
County/Municipality: Birch Hills County
Well Name: PCP NUMAC TANGENT A11-29-80-23
Operator Name: Obsidian Energy Ltd.
License Number: 0085742
License Date: 1980-09-19
License Status: Suspension
Spud Date: 1980-09-04
Final Drill Date: 1980-09-15
Well Total Depth: 1280.00 m
Surface Hole Latitude: 55.965797
Surface Hole Longitude: -117.569476

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-13 Well Log Performed
1980-09-15 Finished Drilling
1980-09-15 Well Mode changed to Drilled and Cased
1980-09-17 Drill Stem Test Performed
1980-09-18 Drill Stem Test Performed
1980-09-19 Drill Stem Test Performed
1980-09-19 Obtained License
1980-09-22 Drill Stem Test Performed
1980-09-23 Drill Stem Test Performed
1980-09-26 Kick Occurred
1980-09-28 Production Casing Operation Performed
1981-07-12 Perforation Treatment Performed - Jet Perforation
1981-12-20 Perforation Treatment Performed - Cement Squeeze
1981-12-20 Plug Back Performed
1981-12-23 Perforation Treatment Performed - Jet Perforation
1989-07-12 Well Log Performed
1989-07-15 Perforation Treatment Performed - Cement Squeeze
1989-07-15 Plug Back Performed
1989-07-17 Well Log Performed
1989-07-18 Perforation Treatment Performed - Jet Perforation
1989-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-21 Well Log Performed
1989-07-22 Perforation Treatment Performed - Jet Perforation
1989-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-27 Perforation Treatment Performed - Fractured
1989-07-28 Well Log Performed
1989-07-29 Well Log Performed
1989-07-30 Perforation Treatment Performed - Jet Perforation
1989-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-25 Well Began Production
1989-08-25 Well Fluid changed to Gas
1989-08-25 Well Mode changed to Flowing
1989-11-30 Perforation Treatment Performed - Fractured
1991-11-30 Well Fluid changed to Gas
1991-11-30 Well Mode changed to Suspended
2011-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-13 Plug Back Performed
2011-03-13 Well Fluid changed to Gas
2011-03-13 Well Log Performed
2011-03-13 Well Mode changed to Abandoned Zone
2016-12-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-12 Perforation 730.00 732.50 7
1989-07-23 Acid Treatment 1085.00 1092.50 0
1989-07-27 Fracture 1085.00 1092.50 0
1989-07-30 Perforation 1067.00 1072.00 7
1989-07-30 Perforation 1074.00 1076.30 7
1989-07-31 Acid Treatment 1067.00 1076.30 0
1989-11-30 Fracture 1067.00 1076.00 0
2011-03-13 Packing Device Capped w/Cement 1054.00 1062.00 0
1981-12-20 Cement Squeeze 730.00 732.50 0
1981-12-23 Perforation 761.50 762.20 13
1989-07-15 Cement Squeeze 761.50 762.20 0
1989-07-18 Perforation 1115.00 1116.50 7
1989-07-18 Perforation 1119.00 1120.50 7
1989-07-20 Acid Treatment 1115.00 1120.50 0
1989-07-22 Perforation 1085.00 1087.50 7
1989-07-22 Perforation 1089.50 1092.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2413 0.0 0.0 0.0
1990 2159 0.0 0.0 0.0
1991 6 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-09-26 Kick 1280.00 1280.00

For data sources see[6]

References