X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805232906002

Well Details

Well ID: 0805232906002
Loading map...
Location: 00/06-29-080-23W5/2
Location Alias: 00/06-29-80-23 W5M
Location Alias 2: 00/06-29-080-23 W5/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 29
County/Municipality: Birch Hills County
Well Name: INTERACTION TANGENT 6-29-80-23
Operator Name: Obsidian Energy Ltd.
License Number: 0103098
License Date: 1983-09-15
License Status: Suspension
Spud Date: 1983-10-02
Final Drill Date: 1983-10-23
Well Total Depth: 1901.00 m
Surface Hole Latitude: 55.963092
Surface Hole Longitude: -117.564589

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-15 Obtained License
1983-10-23 Finished Drilling
1983-10-23 Well Mode changed to Drilled and Cased
1983-10-25 Production Casing Operation Performed
1983-11-16 Perforation Treatment Performed - Jet Perforation
1983-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-15 Well Log Performed
1984-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-16 Plug Back Performed
1984-10-19 Perforation Treatment Performed - Jet Perforation
1984-10-20 Perforation Treatment Performed - Jet Perforation
1985-03-01 Well Began Production
1985-03-01 Well Fluid changed to Gas
1985-03-01 Well Mode changed to Flowing
1987-09-17 Well Fluid changed to Gas
1987-09-17 Well Mode changed to Suspended
2000-11-30 Well Log Performed
2001-07-05 Well Log Performed
2001-07-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-16 Perforation 1733.00 1738.00 0
1983-11-16 Perforation 1744.00 1745.50 0
1983-11-16 Perforation 1747.00 1749.00 0
1983-11-16 Perforation 1757.50 1760.00 0
1983-11-16 Perforation 1768.00 1771.00 0
1983-11-17 Acid Treatment 1733.00 1771.00 0
1984-10-16 Packing Device Capped w/Cement 1719.00 1727.00 0
1984-10-19 Perforation 394.00 395.00 7
1984-10-20 Perforation 344.50 345.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4795 0.0 0.0 0.0
1986 2680 0.0 0.0 0.0

For data sources see[5]

References