X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805232902002

Well Details

Well ID: 0805232902002
Loading map...
Location: 00/02-29-080-23W5/2
Location Alias: 00/02-29-80-23 W5M
Location Alias 2: 00/02-29-080-23 W5/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 29
County/Municipality: Birch Hills County
Well Name: INTERACTION TANGENT 2-29-80-23
Operator Name: Obsidian Energy Ltd.
License Number: 0222201
License Date: 1999-03-30
License Status: Suspension
Spud Date: 1999-04-09
Final Drill Date: 1999-04-21
Well Total Depth: 1918.00 m
Surface Hole Latitude: 55.954412
Surface Hole Longitude: -117.553200

For data sources see[1][2]

Well History

Date Event
1999-03-30 Obtained License
1999-04-10 Surface Casing Operation Performed
1999-04-13 Direction Drilling Operation Performed - Deviate
1999-04-13 Drill Stem Test Performed
1999-04-21 Finished Drilling
1999-04-21 Well Log Performed
1999-04-21 Well Mode changed to Drilled and Cased
1999-04-22 Drill Stem Test Performed
1999-04-23 Production Casing Operation Performed
1999-04-23 Rig Released
1999-04-30 Perforation Treatment Performed - Jet Perforation
1999-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-28 Well Log Performed
2003-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-01 Plug Back Performed
2003-02-02 Perforation Treatment Performed - Jet Perforation
2003-02-08 Well Began Production
2003-02-08 Well Fluid changed to Gas
2003-02-08 Well Mode changed to Flowing
2006-08-19 Well Fluid changed to Gas
2006-08-19 Well Mode changed to Suspended
2008-07-21 Well Fluid changed to Gas
2008-07-21 Well Mode changed to Flowing
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-04-13 998.10 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-04-30 Perforation 1853.50 1857.50 20
1999-04-30 Perforation 1860.00 1864.00 20
1999-04-30 Perforation 1865.50 1867.00 20
1999-04-30 Perforation 1868.50 1874.00 20
1999-05-02 Acid Treatment 1853.50 1874.00 0
2003-02-01 Packing Device Capped w/Cement 1820.00 1828.00 0
2003-02-02 Perforation 753.00 755.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 7058 0.0 0.0 0.0
2004 6940 0.0 0.0 0.0
2005 2349 0.0 0.0 0.0
2008 3308 0.0 0.0 0.0
2009 2881 0.0 0.0 0.0
2010 3575 0.0 0.0 0.0
2011 5002 0.0 0.0 0.0
2012 8597 0.0 0.0 0.0
2013 7246 0.0 0.0 0.0

For data sources see[6]

References