X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805232515002

Well Details

Well ID: 0805232515002
Loading map...
Location: 00/15-25-080-23W5/2
Location Alias: 00/15-25-80-23 W5M
Location Alias 2: 00/15-25-080-23 W5/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 25
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL ET AL TANGENT 15-25-80-23
Operator Name: Canadian Natural Resources Limited
License Number: 0011084
License Date: 1956-02-27
License Status: Suspension
Spud Date: 1956-03-26
Final Drill Date: 1956-05-08
Well Total Depth: 2273.20 m
Surface Hole Latitude: 55.968828
Surface Hole Longitude: -117.456248

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-02-27 Obtained License
1956-04-01 Drill Stem Test Performed
1956-04-03 Drill Stem Test Performed
1956-04-04 Drill Stem Test Performed
1956-04-30 Drill Stem Test Performed
1956-05-08 Finished Drilling
1956-05-08 Well Mode changed to Drilled and Cased
1956-05-15 Production Casing Operation Performed
1956-05-17 Drill Stem Test Performed
1956-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-05-17 Perforation Treatment Performed - Jet Perforation
1956-05-18 Perforation Treatment Performed - Jet Perforation
1956-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-05-20 Perforation Treatment Performed - Jet Perforation
1956-10-13 Perforation Treatment Performed - Cement Squeeze
1956-10-15 Perforation Treatment Performed - Bullet Perforation
1956-10-18 Perforation Treatment Performed - Fractured
1996-12-12 Perforation Treatment Performed - Cement Squeeze
1996-12-12 Perforation Treatment Performed - Jet Perforation
1997-01-16 Well Log Performed
1997-01-17 Well Log Performed
1997-01-19 Well Log Performed
1997-03-13 Perforation Treatment Performed - Fractured
1997-03-20 Perforation Treatment Performed - Jet Perforation
1997-03-20 Well Log Performed
1997-03-21 Perforation Treatment Performed - Fractured
2001-01-26 Well Began Production
2001-01-26 Well Fluid changed to Gas
2001-01-26 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2016-08-31 Well Fluid changed to Gas
2016-08-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-05-17 Perforation 889.40 891.20 13
1996-12-12 Perforation 864.40 865.90 26
1996-12-12 Cement Squeeze 864.40 865.90 0
1996-12-12 Perforation 852.50 860.10 13
1996-12-12 Perforation 727.20 728.40 13
1997-03-13 Fracture 852.50 860.10 0
1997-03-20 Perforation 844.90 860.10 13
1997-03-21 Fracture 844.90 860.10 0
1956-05-17 Packing Device Capped w/Cement 883.90 883.90 0
1956-05-18 Perforation 864.40 865.90 26
1956-05-20 Packing Device Capped w/Cement 858.60 859.50 0
1956-05-20 Perforation 726.90 728.50 26
1956-10-13 Cement Squeeze 726.90 728.50 0
1956-10-15 Bullet Perforation 845.50 851.00 13
1956-10-18 Fracture 845.50 851.00 0
1996-12-12 Cement Squeeze 845.50 851.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1654 0.0 0.0 0.0
2002 7465 0.0 0.0 0.0
2003 8375 0.0 0.0 0.0
2004 8682 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8385 0.0 0.0 0.0
2009 8520 0.0 0.0 0.0
2010 8676 0.0 0.0 0.0
2011 8332 0.0 0.0 0.0
2012 7378 0.0 0.0 0.0
2013 7637 0.0 0.0 0.0
2014 7761 0.0 0.0 0.0
2015 1752 0.0 0.0 0.0

For data sources see[5]

References