X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805232016022

Well Details

Well ID: 0805232016022
Loading map...
Location: 02/16-20-080-23W5/2
Location Alias: 02/16-20-80-23 W5M
Location Alias 2: 02/16-20-080-23 W5/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 20
County/Municipality: Birch Hills County
Well Name: INTERACTION TANGENT 16-20-80-23-5
Operator Name: Obsidian Energy Ltd.
License Number: 0221432
License Date: 1999-02-09
License Status: Issued
Spud Date: 1999-08-06
Final Drill Date: 1999-08-14
Well Total Depth: 1796.00 m
Surface Hole Latitude: 55.954123
Surface Hole Longitude: -117.553700

For data sources see[1][2]

Well History

Date Event
1999-02-09 Obtained License
1999-08-05 Well Log Performed
1999-08-07 Well Log Performed
1999-08-08 Direction Drilling Operation Performed - Deviate
1999-08-14 Finished Drilling
1999-08-16 Liner Casing Operation Performed
1999-08-16 Perforation Treatment Performed - Open-Hole Completion
1999-08-16 Perforation Treatment Performed - Slotted Liner or Casing
1999-08-16 Rig Released
1999-08-16 Well Mode changed to Drilled and Cased
1999-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1999-08-19 Well Began Production
1999-08-19 Well Fluid changed to Crude Oil
1999-08-19 Well Mode changed to Pumping
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Suspended
2017-08-17 Well Fluid changed to Crude Oil
2017-08-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-08-08 1516.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-16 Slotted Liner 1516.20 1764.80 0
1999-08-16 Open Hole/Barefoot Completion 1764.80 1796.00 0
1999-08-19 Acid Wash 1516.20 1796.00 0
1999-08-19 Acid Treatment 1516.20 1796.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1109 0.0 0.0 0.0
2000 6159 0.0 0.0 0.0
2001 8587 0.0 0.0 0.0
2002 8631 0.0 0.0 0.0
2003 8599 0.0 0.0 0.0
2004 8605 0.0 0.0 0.0
2005 8684 0.0 0.0 0.0
2006 5877 0.0 0.0 0.0
2008 629 0.0 0.0 0.0
2009 5269 0.0 0.0 0.0
2010 8611 0.0 0.0 0.0
2011 72 0.0 0.0 0.0
2017 1663 0.0 0.0 0.0
2018 15 0.0 0.0 0.0

For data sources see[6]

References