X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805231902000

Well Details

Well ID: 0805231902000
Loading map...
Location: 00/02-19-080-23W5/0
Location Alias: 00/02-19-80-23 W5M
Location Alias 2: 00/02-19-080-23 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 19
County/Municipality: Birch Hills County
Well Name: INTERACTION TANGENT 2-19-80-23
Operator Name: Obsidian Energy Ltd.
License Number: 0131297
License Date: 1988-01-12
License Status: Issued
Spud Date: 1988-01-16
Final Drill Date: 1988-01-25
Well Total Depth: 1857.00 m
Surface Hole Latitude: 55.944992
Surface Hole Longitude: -117.587220

For data sources see[1][2]

Well History

Date Event
1988-01-12 Obtained License
1988-01-17 Surface Casing Operation Performed
1988-01-25 Finished Drilling
1988-01-25 Well Log Performed
1988-01-25 Well Mode changed to Drilled and Cased
1988-01-30 Drill Stem Test Performed
1988-01-31 Production Casing Operation Performed
1988-02-01 Rig Released
1988-02-14 Perforation Treatment Performed - Jet Perforation
1988-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-19 Well Began Production
1988-02-19 Well Fluid changed to Crude Oil
1988-02-19 Well Mode changed to Flowing
1989-11-24 Well Log Performed
1989-11-25 Perforation Treatment Performed - Jet Perforation
1989-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-26 Perforation Treatment Performed - Jet Perforation
1990-07-26 Well Log Performed
1990-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-12 Well Fluid changed to Crude Oil
1990-11-12 Well Mode changed to Pumping
1994-04-28 Well Log Performed
1994-04-29 Perforation Treatment Performed - Jet Perforation
1994-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-07 Well Log Performed
2010-02-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-14 Perforation 1804.50 1807.00 13
1988-02-16 Acid Treatment 1804.50 1807.00 0
1989-11-25 Perforation 1782.00 1784.00 13
1989-11-28 Acid Treatment 1782.00 1784.00 0
1990-07-26 Perforation 1771.00 1774.50 13
1990-07-27 Acid Treatment 1771.00 1774.50 0
1994-04-29 Perforation 1765.50 1769.00 18
1994-05-02 Acid Treatment 1765.50 1769.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 7239 0.0 0.0 0.0
1989 8321 0.0 0.0 0.0
1990 7881 0.0 0.0 0.0
1991 8657 0.0 0.0 0.0
1992 8444 0.0 0.0 0.0
1993 8239 0.0 0.0 0.0
1994 8229 0.0 0.0 0.0
1995 8693 0.0 0.0 0.0
1996 8251 0.0 0.0 0.0
1997 8639 0.0 0.0 0.0
1998 8455 0.0 0.0 0.0
1999 8406 0.0 0.0 0.0
2000 8447 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 8755 0.0 0.0 0.0
2003 8719 0.0 0.0 0.0
2004 8166 0.0 0.0 0.0
2005 8746 0.0 0.0 0.0
2006 8518 0.0 0.0 0.0
2007 8348 0.0 0.0 0.0
2008 6233 0.0 0.0 0.0
2009 8588 0.0 0.0 0.0
2010 7412 0.0 0.0 0.0
2011 8526 0.0 0.0 0.0
2012 8679 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8705 0.0 0.0 0.0
2015 8751 0.0 0.0 0.0
2016 8584 0.0 0.0 0.0
2017 8699 0.0 0.0 0.0
2018 6674 0.0 0.0 0.0

For data sources see[5]

References