X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805230104000

Well Details

Well ID: 0805230104000
Loading map...
Location: 00/04-01-080-23W5/0
Location Alias: 00/04-01-80-23 W5M
Location Alias 2: 00/04-01-080-23 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 01
County/Municipality: Municipal District of Smoky River No. 130
Well Name: SEC HZ TANGENT 4-1-80-23
Operator Name: Shoreline Energy Corp.
License Number: 0448328
License Date: 2012-09-10
License Status: Abandoned
Spud Date: 2012-10-25
Final Drill Date: 2012-10-31
Well Total Depth: 2084.00 m
Surface Hole Latitude: 55.911244
Surface Hole Longitude: -117.470306

For data sources see[1][2]

Well History

Date Event
2012-09-10 Obtained License
2012-10-26 Lost Circulation Occurred
2012-10-27 Surface Casing Operation Performed
2012-10-28 Direction Drilling Operation Performed - Deviate
2012-10-29 Direction Drilling Operation Performed - Horizontal
2012-10-31 Finished Drilling
2012-10-31 Well Log Performed
2012-10-31 Well Mode changed to Drilled and Cased
2012-11-03 Production Casing Operation Performed
2012-11-03 Rig Released
2012-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-26 Plug Back Performed
2018-11-26 Well Mode changed to Abandoned Zone
2018-12-01 Well Abandoned
2018-12-01 Well Mode changed to Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-25 Horizon Drilling Inc. 29 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-28 562.80 Deviate (5 - 79 degrees)
2012-10-29 1000.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-15 Multi-Stage Fracture 2006.40 2006.90 0
2012-11-16 Multi-Stage Fracture 1528.40 1528.90 0
2012-11-16 Multi-Stage Fracture 1477.80 1478.30 0
2012-11-16 Multi-Stage Fracture 1427.40 1427.90 0
2012-11-16 Multi-Stage Fracture 1376.90 1377.40 0
2012-11-16 Multi-Stage Fracture 1326.30 1326.80 0
2012-11-16 Multi-Stage Fracture 1281.20 1281.70 0
2012-11-16 Multi-Stage Fracture 1230.60 1231.10 0
2012-11-16 Multi-Stage Fracture 1180.40 1180.90 0
2012-11-16 Multi-Stage Fracture 1131.00 1131.50 0
2018-11-26 Packing Device Capped w/Cement 926.00 950.00 0
2012-11-15 Multi-Stage Fracture 1956.10 1956.60 0
2012-11-15 Multi-Stage Fracture 1905.40 1905.90 0
2012-11-15 Multi-Stage Fracture 1854.80 1855.30 0
2012-11-15 Multi-Stage Fracture 1804.20 1804.70 0
2012-11-15 Multi-Stage Fracture 1753.80 1754.30 0
2012-11-15 Multi-Stage Fracture 1703.20 1703.70 0
2012-11-16 Multi-Stage Fracture 1629.20 1629.70 0
2012-11-16 Multi-Stage Fracture 1579.00 1579.50 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-26 Lost Circulation 113.00 249.00
2012-11-23 No Incident Encountered 0.00 0.00
2018-12-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References