X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805173414000

Well Details

Well ID: 0805173414000
Loading map...
Location: 00/14-34-080-17W5/0
Location Alias: 00/14-34-80-17 W5M
Location Alias 2: 00/14-34-080-17 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 17
Section: 34
County/Municipality: Northern Sunrise County
Well Name: WISER DAWSON 14-34-80-17
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0005757
License Date: 1952-12-02
License Status: Abandoned
Spud Date: 1952-12-10
Final Drill Date: 1953-02-06
Well Total Depth: 2096.10 m
Surface Hole Latitude: 55.983433
Surface Hole Longitude: -116.575068

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-02 Obtained License
1952-12-15 Drill Stem Test Performed
1952-12-18 Drill Stem Test Performed
1952-12-19 Drill Stem Test Performed
1952-12-21 Drill Stem Test Performed
1952-12-22 Drill Stem Test Performed
1952-12-23 Drill Stem Test Performed
1952-12-24 Drill Stem Test Performed
1953-01-06 Drill Stem Test Performed
1953-01-09 Drill Stem Test Performed
1953-01-19 Drill Stem Test Performed
1953-02-06 Drill Stem Test Performed
1953-02-06 Finished Drilling
1953-02-06 Well Mode changed to Drilled and Cased
1953-02-08 Drill Stem Test Performed
1953-02-13 Perforation Treatment Performed - Bullet Perforation
1953-02-13 Production Casing Operation Performed
1953-02-14 Perforation Treatment Performed - Cement Squeeze
1953-02-15 Perforation Treatment Performed - Bullet Perforation
1953-02-16 Drill Stem Test Performed
1953-02-27 Drill Stem Test Performed
1953-03-01 Perforation Treatment Performed - Cement Squeeze
1953-03-03 Perforation Treatment Performed - Bullet Perforation
1953-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-03-20 Well Began Production
1953-03-20 Well Fluid changed to Crude Oil
1953-03-20 Well Mode changed to Flowing
1959-09-01 Well Fluid changed to Crude Oil
1959-09-01 Well Mode changed to Pumping
1991-09-01 Well Fluid changed to Crude Oil
1991-09-01 Well Mode changed to Suspended
1993-11-24 Well Log Performed
1993-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-25 Perforation Treatment Performed - Jet Perforation
1993-11-25 Plug Back Performed
1993-11-25 Well Fluid changed to Crude Oil
1993-11-25 Well Mode changed to Abandoned
1993-11-26 Perforation Treatment Performed - Remedial Casing
1993-11-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-13 Bullet Perforation 2072.00 2073.20 13
1993-11-26 Remedial Casing Cementing 375.00 376.00 0
1953-02-14 Cement Squeeze 2072.00 2073.20 0
1953-02-15 Bullet Perforation 2072.60 2073.20 13
1953-02-15 Bullet Perforation 2072.60 2072.90 13
1953-03-01 Cement Squeeze 2072.60 2073.20 0
1953-03-03 Bullet Perforation 2069.60 2073.20 13
1953-03-06 Acid Treatment 2069.60 2073.20 0
1993-11-25 Packing Device Capped w/Cement 1955.00 1963.00 0
1993-11-25 Perforation 375.00 376.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 648 0.0 0.0 0.0
1968 1044 0.0 0.0 0.0
1969 4098 0.0 0.0 0.0
1970 358 0.0 0.0 0.0
1971 2901 0.0 0.0 0.0
1972 2505 0.0 0.0 0.0
1973 2777 0.0 0.0 0.0
1974 3058 0.0 0.0 0.0
1975 3386 0.0 0.0 0.0
1976 2424 0.0 0.0 0.0
1977 1696 0.0 0.0 0.0
1978 1056 0.0 0.0 0.0
1979 1728 0.0 0.0 0.0
1980 5180 0.0 0.0 0.0
1981 5302 0.0 0.0 0.0
1982 7031 0.0 0.0 0.0
1983 7304 0.0 0.0 0.0
1984 7399 0.0 0.0 0.0
1985 7483 0.0 0.0 0.0
1986 3914 0.0 0.0 0.0
1987 744 0.0 0.0 0.0
1988 264 0.0 0.0 0.0

For data sources see[5]

References