X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805093604000

Well Details

Well ID: 0805093604000
Loading map...
Location: 00/04-36-080-09W5/0
Location Alias: 00/04-36-80-09 W5M
Location Alias 2: 00/04-36-080-09 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 09
Section: 36
County/Municipality: Northern Sunrise County
Well Name: PAN AM J-1 NIPISI 4-36-80-9
Operator Name: Canadian Natural Resources Limited
License Number: 0030245
License Date: 1966-03-16
License Status: Suspension
Spud Date: 1966-03-20
Final Drill Date: 1966-04-04
Well Total Depth: 1824.20 m
Surface Hole Latitude: 55.972989
Surface Hole Longitude: -115.276311

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-16 Obtained License
1966-03-27 Lost Circulation Occurred
1966-04-02 Lost Circulation Occurred
1966-04-04 Finished Drilling
1966-04-04 Well Mode changed to Drilled and Cased
1966-04-06 Drill Stem Test Performed
1966-04-07 Drill Stem Test Performed
1966-04-08 Production Casing Operation Performed
1966-05-05 Perforation Treatment Performed - Jet Perforation
1966-05-07 Well Began Production
1966-05-07 Well Fluid changed to Crude Oil
1966-05-07 Well Mode changed to Flowing
1973-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-12 Well Began Injection
1973-02-12 Well Fluid changed to Water
1973-02-12 Well Type changed to Injection
1981-05-28 Perforation Treatment Performed - Jet Perforation
1981-05-30 Perforation Treatment Performed - Fractured
1987-03-01 Well Fluid changed to Water
1987-03-01 Well Mode changed to Suspended
1987-03-01 Well Type changed to Injection
1990-09-01 Well Fluid changed to Water
1990-09-01 Well Type changed to Injection
1991-07-15 Perforation Treatment Performed - Jet Perforation
1991-07-16 Perforation Treatment Performed - Acid Wash - No Pressure
1991-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-23 Well Log Performed
1995-11-24 Well Log Performed
1996-11-07 Well Log Performed
1997-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-10-31 Well Fluid changed to Water
2016-10-31 Well Mode changed to Suspended
2016-10-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-05-05 Perforation 1701.70 1705.40 7
1991-07-17 Acid Treatment 1700.80 1710.40 0
1997-01-05 Packing Device Capped w/Cement 1775.60 1783.60 0
1966-05-05 Perforation 1706.00 1707.20 7
1973-02-09 Acid Treatment 1701.70 1707.20 0
1981-05-28 Perforation 1701.50 1705.10 13
1981-05-28 Perforation 1705.80 1710.40 13
1981-05-30 Fracture 1701.50 1710.40 0
1991-07-15 Perforation 1700.80 1704.40 13
1991-07-15 Perforation 1705.10 1706.30 13
1991-07-16 Acid Wash 1700.80 1710.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 4438 0.0 0.0 0.0
1968 6810 0.0 0.0 0.0
1969 7696 0.0 0.0 0.0
1970 6328 0.0 0.0 0.0
1971 4884 0.0 0.0 0.0
1972 8455 0.0 0.0 0.0
1973 888 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-03-27 Lost Circulation 1517.90 1726.30
1966-04-02 Lost Circulation 1726.30 1758.60

For data sources see[6]

References