X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805083002000

Well Details

Well ID: 0805083002000
Loading map...
Location: 00/02-30-080-08W5/0
Location Alias: 00/02-30-80-08 W5M
Location Alias 2: 00/02-30-080-08 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 08
Section: 30
County/Municipality: Northern Sunrise County
Well Name: MOBIL NIPISI 2-30-80-8
Operator Name: Canadian Natural Resources Limited
License Number: 0030073
License Date: 1966-02-22
License Status: Issued
Spud Date: 1966-03-12
Final Drill Date: 1966-03-29
Well Total Depth: 1811.70 m
Surface Hole Latitude: 55.958219
Surface Hole Longitude: -115.237392

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-22 Obtained License
1966-03-29 Finished Drilling
1966-03-29 Well Mode changed to Drilled and Cased
1966-04-01 Drill Stem Test Performed
1966-04-02 Drill Stem Test Performed
1966-04-03 Drill Stem Test Performed
1966-04-04 Drill Stem Test Performed
1966-04-06 Production Casing Operation Performed
1966-06-21 Perforation Treatment Performed - Jet Perforation
1966-07-07 Well Began Production
1966-07-07 Well Fluid changed to Crude Oil
1966-07-07 Well Mode changed to Flowing
1969-02-01 Well Began Injection
1969-02-01 Well Fluid changed to Water
1969-02-01 Well Type changed to Injection
1969-03-10 Perforation Treatment Performed - Alcohol Squeeze
1969-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-29 Perforation Treatment Performed - Jet Perforation
1969-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-30 Perforation Treatment Performed - Jet Perforation
1969-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Pumping
1988-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-04-01 Well Fluid changed to Crude Oil
2002-04-01 Well Mode changed to Suspended
2008-11-25 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-21 Perforation 1702.00 1704.40 7
1969-03-10 Alchohol Squeeze 1702.00 1704.40 0
1969-06-29 Perforation 1715.40 1716.60 13
1969-06-29 Acid Treatment 1715.40 1716.60 0
1969-06-30 Perforation 1702.00 1704.40 7
1969-06-30 Acid Treatment 1702.00 1704.40 0
1969-07-02 Acid Treatment 1702.00 1704.40 0
1969-11-13 Acid Treatment 1702.00 1716.60 0
1988-03-02 Acid Treatment 1702.00 1716.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 1800 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 6366 0.0 0.0 0.0
1989 3557 0.0 0.0 0.0
1990 4965 0.0 0.0 0.0
1991 5903 0.0 0.0 0.0
1992 1990 0.0 0.0 0.0

For data sources see[5]

References