X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805080902000

Well Details

Well ID: 0805080902000
Loading map...
Location: 00/02-09-080-08W5/0
Location Alias: 00/02-09-80-08 W5M
Location Alias 2: 00/02-09-080-08 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 08
Section: 09
County/Municipality: Northern Sunrise County
Well Name: AMOCO UNIT 159 NIPISI 2-9-80-8
Operator Name: Canadian Natural Resources Limited
License Number: 0102471
License Date: 1983-08-02
License Status: Issued
Spud Date: 1983-10-24
Final Drill Date: 1983-11-30
Well Total Depth: 2062.00 m
Surface Hole Latitude: 55.912384
Surface Hole Longitude: -115.170917

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-02 Obtained License
1983-10-24 Direction Drilling Operation Performed - 98
1983-11-30 Finished Drilling
1983-11-30 Well Mode changed to Drilled and Cased
1983-12-04 Production Casing Operation Performed
1983-12-19 Well Log Performed
1983-12-20 Perforation Treatment Performed - Jet Perforation
1983-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-25 Well Began Production
1984-01-25 Well Fluid changed to Crude Oil
1984-01-25 Well Mode changed to Pumping
2003-12-03 Perforation Treatment Performed - Cement Squeeze
2003-12-09 Perforation Treatment Performed - Jet Perforation
2003-12-09 Well Log Performed
2006-02-01 Well Fluid changed to Crude Oil
2006-02-01 Well Mode changed to Suspended
2008-11-25 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-10-24 300.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-20 Perforation 2013.30 2017.00 13
1983-12-20 Perforation 2006.50 2012.30 13
1983-12-20 Perforation 2002.50 2005.50 13
1983-12-21 Acid Treatment 2002.50 2017.00 0
2003-12-03 Cement Squeeze 2002.00 2017.00 0
2003-12-09 Perforation 2000.50 2001.50 17
2003-12-09 Perforation 2008.00 2009.00 17
2003-12-09 Perforation 2015.50 2016.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 7622 0.0 0.0 0.0
1985 7974 0.0 0.0 0.0
1986 2579 0.0 0.0 0.0
1987 8362 0.0 0.0 0.0
1988 8535 0.0 0.0 0.0
1989 8457 0.0 0.0 0.0
1990 8420 0.0 0.0 0.0
1991 8649 0.0 0.0 0.0
1992 7881 0.0 0.0 0.0
1993 8381 0.0 0.0 0.0
1994 8176 0.0 0.0 0.0
1995 7329 0.0 0.0 0.0
1996 8280 0.0 0.0 0.0
1997 3803 0.0 0.0 0.0
2001 3888 0.0 0.0 0.0
2002 8440 0.0 0.0 0.0
2003 6840 0.0 0.0 0.0
2004 5393 0.0 0.0 0.0

For data sources see[6]

References