X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805080502000

Well Details

Well ID: 0805080502000
Loading map...
Location: 00/02-05-080-08W5/0
Location Alias: 00/02-05-80-08 W5M
Location Alias 2: 00/02-05-080-08 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 08
Section: 05
County/Municipality: Northern Sunrise County
Well Name: AMOCO UNIT 102 NIPISI 2-5-80-8
Operator Name: Canadian Natural Resources Limited
License Number: 0118045
License Date: 1985-10-02
License Status: Suspension
Spud Date: 1985-10-29
Final Drill Date: 1985-11-24
Well Total Depth: 2272.00 m
Surface Hole Latitude: 55.892544
Surface Hole Longitude: -115.198739

For data sources see[1][2]

Well History

Date Event
1985-10-02 Obtained License
1985-10-22 Well Log Performed
1985-10-30 Lost Circulation Occurred
1985-10-31 Surface Casing Operation Performed
1985-11-02 Direction Drilling Operation Performed - Deviate
1985-11-11 Lost Circulation Occurred
1985-11-24 Finished Drilling
1985-11-24 Well Mode changed to Drilled and Cased
1985-11-26 Well Log Performed
1985-11-28 Production Casing Operation Performed
1985-11-29 Well Log Performed
1985-11-30 Rig Released
1985-12-12 Well Log Performed
1985-12-13 Perforation Treatment Performed - Jet Perforation
1985-12-15 Perforation Treatment Performed - Fractured
1985-12-23 Well Began Production
1985-12-23 Well Fluid changed to Crude Oil
1985-12-23 Well Mode changed to Pumping
1996-01-06 Perforation Treatment Performed - Cement Squeeze
1996-01-11 Perforation Treatment Performed - Jet Perforation
2003-10-16 Perforation Treatment Performed - Cement Squeeze
2003-10-19 Perforation Treatment Performed - Jet Perforation
2018-04-30 Well Fluid changed to Crude Oil
2018-04-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-11-02 384.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-13 Perforation 2182.00 2185.50 13
1985-12-13 Perforation 2188.00 2193.00 13
1985-12-13 Perforation 2195.00 2204.00 13
1985-12-15 Fracture 2182.00 2204.00 0
1996-01-06 Cement Squeeze 2182.00 2204.00 0
1996-01-11 Perforation 2182.00 2185.50 17
1996-01-11 Perforation 2188.00 2191.50 17
2003-10-16 Cement Squeeze 2182.00 2191.50 0
2003-10-19 Perforation 2183.50 2184.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 209 0.0 0.0 0.0
1986 8212 0.0 0.0 0.0
1987 7626 0.0 0.0 0.0
1988 8426 0.0 0.0 0.0
1989 8607 0.0 0.0 0.0
1990 8560 0.0 0.0 0.0
1991 8294 0.0 0.0 0.0
1992 8378 0.0 0.0 0.0
1993 7771 0.0 0.0 0.0
1994 6592 0.0 0.0 0.0
1995 8261 0.0 0.0 0.0
1996 8378 0.0 0.0 0.0
1997 8478 0.0 0.0 0.0
1998 8494 0.0 0.0 0.0
1999 8626 0.0 0.0 0.0
2000 8424 0.0 0.0 0.0
2001 8431 0.0 0.0 0.0
2002 8117 0.0 0.0 0.0
2003 7396 0.0 0.0 0.0
2004 8651 0.0 0.0 0.0
2005 8133 0.0 0.0 0.0
2006 8469 0.0 0.0 0.0
2007 7537 0.0 0.0 0.0
2008 6839 0.0 0.0 0.0
2009 7770 0.0 0.0 0.0
2010 8031 0.0 0.0 0.0
2011 7331 0.0 0.0 0.0
2012 8665 0.0 0.0 0.0
2013 8096 0.0 0.0 0.0
2014 8327 0.0 0.0 0.0
2015 7997 0.0 0.0 0.0
2016 8592 0.0 0.0 0.0
2017 6874 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-11-11 Lost Circulation 1418.00 1586.00
1985-10-30 Lost Circulation 144.00 144.00

For data sources see[7]

References