X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805080402000

Well Details

Well ID: 0805080402000
Loading map...
Location: 00/02-04-080-08W5/0
Location Alias: 00/02-04-80-08 W5M
Location Alias 2: 00/02-04-080-08 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 08
Section: 04
County/Municipality: Northern Sunrise County
Well Name: AMOCO ET AL NIPISI 2-4-80-8
Operator Name: Canadian Natural Resources Limited
License Number: 0027995
License Date: 1965-03-16
License Status: Suspension
Spud Date: 1965-03-16
Final Drill Date: 1965-03-28
Well Total Depth: 1748.00 m
Surface Hole Latitude: 55.899916
Surface Hole Longitude: -115.184889

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-16 Obtained License
1965-03-28 Finished Drilling
1965-03-28 Well Mode changed to Drilled and Cased
1965-03-30 Drill Stem Test Performed
1965-03-31 Production Casing Operation Performed
1965-04-01 Perforation Treatment Performed - Bullet Perforation
1965-06-27 Well Began Production
1965-06-27 Well Fluid changed to Crude Oil
1965-06-27 Well Mode changed to Flowing
1969-04-01 Perforation Treatment Performed - Jet Perforation
1969-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-27 Perforation Treatment Performed - Acid Wash - No Pressure
1975-05-29 Well Fluid changed to Crude Oil
1975-05-29 Well Mode changed to Pumping
1987-09-13 Perforation Treatment Performed - Jet Perforation
1987-09-13 Well Log Performed
1987-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-14 Well Log Performed
2002-12-15 Perforation Treatment Performed - Cement Squeeze
2002-12-17 Perforation Treatment Performed - Jet Perforation
2002-12-17 Well Log Performed
2016-09-01 Well Fluid changed to Crude Oil
2016-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-04-01 Bullet Perforation 1711.80 1712.40 7
1987-09-15 Acid Treatment 1712.40 1724.10 0
2002-12-15 Cement Squeeze 1711.80 1724.30 0
2002-12-17 Perforation 1711.10 1718.50 17
1965-04-01 Bullet Perforation 1713.00 1713.60 7
1965-04-01 Bullet Perforation 1717.90 1719.40 7
1969-04-01 Perforation 1720.30 1722.70 7
1969-04-01 Perforation 1723.30 1724.30 7
1969-08-06 Acid Treatment 1712.40 1719.40 0
1972-01-27 Acid Wash 1712.40 1724.30 0
1987-09-13 Perforation 1712.40 1713.60 13
1987-09-13 Perforation 1717.70 1724.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 353 0.0 0.0 0.0
1968 1034 0.0 0.0 0.0
1969 7939 0.0 0.0 0.0
1970 4086 0.0 0.0 0.0
1971 4498 0.0 0.0 0.0
1972 7453 0.0 0.0 0.0
1973 8552 0.0 0.0 0.0
1974 8488 0.0 0.0 0.0
1975 5086 0.0 0.0 0.0
1976 3294 0.0 0.0 0.0
1977 3024 0.0 0.0 0.0
1978 4536 0.0 0.0 0.0
1979 8583 0.0 0.0 0.0
1980 5886 0.0 0.0 0.0
1981 5969 0.0 0.0 0.0
1982 5161 0.0 0.0 0.0
1983 4940 0.0 0.0 0.0
1984 5490 0.0 0.0 0.0
1985 8217 0.0 0.0 0.0
1986 2239 0.0 0.0 0.0
1987 8302 0.0 0.0 0.0
1988 8603 0.0 0.0 0.0
1989 8649 0.0 0.0 0.0
1990 8709 0.0 0.0 0.0
1991 8652 0.0 0.0 0.0
1992 8540 0.0 0.0 0.0
1993 8321 0.0 0.0 0.0
1994 8308 0.0 0.0 0.0
1995 8434 0.0 0.0 0.0
1996 8572 0.0 0.0 0.0
1997 8590 0.0 0.0 0.0
1998 8095 0.0 0.0 0.0
1999 8434 0.0 0.0 0.0
2000 8372 0.0 0.0 0.0
2001 8071 0.0 0.0 0.0
2002 7387 0.0 0.0 0.0
2003 8341 0.0 0.0 0.0
2004 8607 0.0 0.0 0.0
2005 8534 0.0 0.0 0.0
2006 7942 0.0 0.0 0.0
2007 8461 0.0 0.0 0.0
2008 7806 0.0 0.0 0.0
2009 8652 0.0 0.0 0.0
2010 5299 0.0 0.0 0.0
2011 7704 0.0 0.0 0.0
2012 7161 0.0 0.0 0.0
2013 7540 0.0 0.0 0.0
2014 8491 0.0 0.0 0.0
2015 4938 0.0 0.0 0.0

For data sources see[5]

References