X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0804230309000

Well Details

Well ID: 0804230309000
Loading map...
Location: 00/09-03-080-23W4/0
Location Alias: 00/09-03-80-23 W4M
Location Alias 2: 00/09-03-080-23 W4/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 4
Range: 23
Section: 03
County/Municipality: Wabasca 166
Well Name: CPEC BRINT 9-3-80-23
Operator Name: Crescent Point Energy Corp.
License Number: 0379931
License Date: 2007-07-30
License Status: Abandoned
Spud Date: 2007-09-20
Final Drill Date: 2007-09-22
Well Total Depth: 2391.00 m
Surface Hole Latitude: 55.907482
Surface Hole Longitude: -113.475120

For data sources see[1][2]

Well History

Date Event
2007-07-30 Obtained License
2007-09-21 Direction Drilling Operation Performed - Horizontal
2007-09-22 Finished Drilling
2007-09-22 Intermediate Casing Operation Performed
2007-09-22 Well Mode changed to Drilled and Cased
2007-09-25 Well Log Performed
2007-09-26 Liner Casing Operation Performed
2007-09-26 Perforation Treatment Performed - Open-Hole Completion
2007-09-26 Perforation Treatment Performed - Slotted Liner or Casing
2007-09-26 Rig Released
2007-09-27 Well Log Performed
2008-04-04 Well Began Production
2008-04-04 Well Fluid changed to Crude Bitumen
2008-04-04 Well Mode changed to Pumping
2014-10-01 Well Fluid changed to Crude Bitumen
2014-10-01 Well Mode changed to Suspended
2019-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-18 Plug Back Performed
2019-12-18 Well Fluid changed to Crude Bitumen
2019-12-18 Well Mode changed to Abandoned Zone
2020-02-11 Well Abandoned
2020-02-11 Well Fluid changed to Crude Bitumen
2020-02-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-09-21 138.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-09-26 Slotted Liner 560.00 2382.30 0
2007-09-26 Open Hole/Barefoot Completion 2382.30 2391.00 0
2019-12-18 Packing Device Capped w/Cement 372.90 456.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1288 0.0 0.0 0.0
2009 6448 0.0 0.0 0.0
2010 2351 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References