X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796090606000

Well Details

Well ID: 0796090606000
Loading map...
Location: 00/06-06-079-09W6/0
Location Alias: 00/06-06-79-09 W6M
Location Alias 2: 00/06-06-079-09 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 09
Section: 06
County/Municipality: Saddle Hills County
Well Name: AMOCO PROGRESS 6-6-79-9
Operator Name: BP Canada Energy Group ULC
License Number: 0112904
License Date: 1985-01-28
License Status: RecCertified
Spud Date: 1985-01-31
Final Drill Date: 1985-02-18
Well Total Depth: 1765.00 m
Surface Hole Latitude: 55.814790
Surface Hole Longitude: -119.402456

For data sources see[1][2]

Well History

Date Event
1985-01-28 Obtained License
1985-02-03 Surface Casing Operation Performed
1985-02-18 Finished Drilling
1985-02-18 Well Log Performed
1985-02-18 Well Mode changed to Drilled and Cased
1985-02-19 Production Casing Operation Performed
1985-02-20 Rig Released
1985-03-15 Well Log Performed
1985-03-16 Perforation Treatment Performed - Jet Perforation
1985-03-16 Well Log Performed
1985-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-21 Perforation Treatment Performed - Fractured
1985-07-22 Well Began Production
1985-07-22 Well Fluid changed to Crude Oil
1985-07-22 Well Mode changed to Pumping
1986-04-24 Well Fluid changed to Crude Oil
1986-04-24 Well Mode changed to Suspended
1992-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-03 Perforation Treatment Performed - Jet Perforation
1992-09-03 Plug Back Performed
1992-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-04 Perforation Treatment Performed - Remedial Casing
1992-09-04 Well Abandoned
1992-09-04 Well Fluid changed to Crude Oil
1992-09-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-16 Perforation 1646.50 1650.00 13
1985-03-18 Acid Treatment 1646.50 1650.00 0
1985-03-21 Fracture 1646.50 1650.00 0
1992-09-03 Packing Device Capped w/Cement 1630.00 1638.00 0
1992-09-03 Perforation 560.00 560.30 39
1992-09-04 Remedial Casing Cementing 560.00 560.30 0
1992-09-04 Packing Device Capped w/Cement 288.00 555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2451 0.0 0.0 0.0

For data sources see[5]

References