X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796050909005

Well Details

Well ID: 0796050909005
Loading map...
Location: 00/09-09-079-05W6/5
Location Alias: 00/09-09-79-05 W6M
Location Alias 2: 00/09-09-079-05 W6/05
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 05
Section: 09
County/Municipality: Municipal District of Spirit River No. 133
Well Name: CNRL ET AL HOWARD 9-9-79-5
Operator Name: Canadian Natural Resources Limited
License Number: 0107393
License Date: 1984-05-31
License Status: Suspension
Spud Date: 1984-06-17
Final Drill Date: 1984-07-08
Well Total Depth: 1705.00 m
Surface Hole Latitude: 55.834816
Surface Hole Longitude: -118.711091

For data sources see[1][2]

Well History

Date Event
1984-05-31 Obtained License
1984-06-18 Surface Casing Operation Performed
1984-06-23 Kick Occurred
1984-06-25 Well Log Performed
1984-06-28 Drill Stem Test Performed
1984-06-30 Drill Stem Test Performed
1984-07-08 Finished Drilling
1984-07-08 Well Mode changed to Drilled and Cased
1984-07-09 Well Log Performed
1984-07-11 Production Casing Operation Performed
1984-07-11 Rig Released
1989-07-22 Well Log Performed
1989-07-23 Perforation Treatment Performed - Jet Perforation
1989-07-23 Well Log Performed
1989-07-28 Perforation Treatment Performed - Jet Perforation
1989-07-28 Well Log Performed
1989-07-29 Perforation Treatment Performed - Jet Perforation
1989-07-29 Well Log Performed
1997-06-07 Perforation Treatment Performed - Jet Perforation
2000-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-10 Perforation Treatment Performed - Cement Squeeze
2000-01-10 Plug Back Performed
2000-01-11 Well Log Performed
2000-01-12 Perforation Treatment Performed - Jet Perforation
2000-01-13 Perforation Treatment Performed - Jet Perforation
2000-01-26 Well Began Production
2000-01-26 Well Fluid changed to Gas
2000-01-26 Well Mode changed to Flowing
2002-10-31 Well Fluid changed to Gas
2002-10-31 Well Mode changed to Suspended
2004-08-20 Well Log Performed
2004-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-22 Plug Back Performed
2011-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-20 Plug Back Performed
2011-10-20 Well Fluid changed to Gas
2011-10-20 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-07-23 Perforation 1585.50 1586.50 13
2000-01-13 Perforation 1089.00 1090.00 14
2000-01-13 Perforation 1092.00 1093.00 14
2000-01-13 Perforation 1094.00 1095.00 14
2000-01-13 Perforation 1099.00 1099.50 14
2004-08-22 Packing Device Capped w/Cement 1077.00 1085.00 0
2011-10-20 Packing Device Capped w/Cement 967.00 975.00 0
1989-07-28 Perforation 1198.00 1199.50 13
1989-07-29 Perforation 1198.00 1199.50 13
1997-06-07 Perforation 1183.00 1185.00 18
2000-01-10 Packing Device Capped w/Cement 1153.50 1562.00 0
2000-01-10 Cement Squeeze 1183.00 1199.50 0
2000-01-12 Perforation 980.50 980.50 2
2000-01-12 Perforation 980.00 981.00 14
2000-01-13 Perforation 994.00 996.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 4267 0.0 0.0 0.0
2001 368 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-06-23 Kick 1188.00 1188.00

For data sources see[6]

References