X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796022910002

Well Details

Well ID: 0796022910002
Loading map...
Location: 00/10-29-079-02W6/2
Location Alias: 00/10-29-79-02 W6M
Location Alias 2: 00/10-29-079-02 W6/02
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 02
Section: 29
County/Municipality: Birch Hills County
Well Name: CNRL DUNVEG 10-29-79-2
Operator Name: Canadian Natural Resources Limited
License Number: 0169970
License Date: 1994-08-29
License Status: Issued
Spud Date: 1994-08-31
Final Drill Date: 1994-09-10
Well Total Depth: 1710.00 m
Surface Hole Latitude: 55.878494
Surface Hole Longitude: -118.270818

For data sources see[1][2]

Well History

Date Event
1994-08-29 Obtained License
1994-09-01 Surface Casing Operation Performed
1994-09-10 Finished Drilling
1994-09-10 Perforation Treatment Performed - Open-Hole Completion
1994-09-10 Well Log Performed
1994-09-10 Well Mode changed to Drilled and Cased
1994-09-11 Drill Stem Test Performed
1994-09-12 Drill Stem Test Performed
1994-09-14 Production Casing Operation Performed
1994-09-14 Rig Released
1994-10-09 Well Log Performed
1994-10-10 Well Log Performed
1994-10-11 Perforation Treatment Performed - Jet Perforation
1994-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-13 Well Log Performed
1994-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-14 Plug Back Performed
1994-10-14 Well Log Performed
1994-10-15 Perforation Treatment Performed - Jet Perforation
1994-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-19 Perforation Treatment Performed - Cement Squeeze
1994-10-20 Well Log Performed
1994-10-21 Perforation Treatment Performed - Jet Perforation
1994-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-24 Well Log Performed
1994-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-25 Plug Back Performed
1994-10-25 Well Log Performed
1994-10-26 Perforation Treatment Performed - Jet Perforation
1994-10-30 Perforation Treatment Performed - Fractured
1994-11-02 Well Log Performed
1994-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-17 Well Began Production
1995-03-17 Well Fluid changed to Gas
1995-03-17 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-10 Open Hole/Barefoot Completion 1698.90 1710.00 0
1994-10-22 Acid Treatment 1482.00 1489.50 0
1994-10-25 Packing Device Capped w/Cement 1469.00 1477.00 0
1994-10-26 Perforation 1460.00 1465.00 14
1994-10-30 Fracture 1460.00 1465.00 0
1994-11-16 Acid Treatment 1460.00 1465.00 0
1994-10-11 Perforation 1548.00 1550.00 18
1994-10-11 Perforation 1552.00 1553.50 18
1994-10-12 Acid Treatment 1548.00 1553.50 0
1994-10-14 Packing Device Capped w/Cement 1537.00 1545.00 0
1994-10-15 Perforation 1515.00 1521.00 18
1994-10-17 Acid Treatment 1515.00 1521.00 0
1994-10-19 Cement Squeeze 1515.00 1521.00 0
1994-10-21 Perforation 1482.00 1489.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5614 0.0 0.0 0.0
1996 7144 0.0 0.0 0.0
1997 8575 0.0 0.0 0.0
1998 8446 0.0 0.0 0.0
1999 8181 0.0 0.0 0.0
2000 8305 0.0 0.0 0.0
2001 7578 0.0 0.0 0.0
2002 8438 0.0 0.0 0.0
2003 8659 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8300 0.0 0.0 0.0
2006 8546 0.0 0.0 0.0
2007 8687 0.0 0.0 0.0
2008 8687 0.0 0.0 0.0
2009 8591 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 8702 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 7919 0.0 0.0 0.0
2014 8705 0.0 0.0 0.0
2015 8698 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8736 0.0 0.0 0.0
2020 2144 0.0 0.0 0.0

For data sources see[5]

References