X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796020104002

Well Details

Well ID: 0796020104002
Loading map...
Location: 00/04-01-079-02W6/2
Location Alias: 00/04-01-79-02 W6M
Location Alias 2: 00/04-01-079-02 W6/02
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 02
Section: 01
County/Municipality: Birch Hills County
Well Name: CNRL BELLOY 4-1-79-2
Operator Name: Canadian Natural Resources Limited
License Number: 0207275
License Date: 1997-10-14
License Status: Abandoned
Spud Date: 1997-10-19
Final Drill Date: 1997-10-27
Well Total Depth: 1558.00 m
Surface Hole Latitude: 55.813259
Surface Hole Longitude: -118.179978

For data sources see[1][2]

Well History

Date Event
1997-10-14 Obtained License
1997-10-19 Lost Circulation Occurred
1997-10-20 Surface Casing Operation Performed
1997-10-27 Finished Drilling
1997-10-27 Well Log Performed
1997-10-27 Well Mode changed to Drilled and Cased
1997-10-28 Drill Stem Test Performed
1997-10-30 Production Casing Operation Performed
1997-10-30 Rig Released
1997-11-22 Well Log Performed
1997-11-23 Well Log Performed
1997-11-24 Perforation Treatment Performed - Jet Perforation
1997-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-28 Well Log Performed
1997-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-29 Perforation Treatment Performed - Jet Perforation
1997-11-29 Well Log Performed
1997-11-30 Perforation Treatment Performed - Jet Perforation
1997-12-02 Perforation Treatment Performed - Fractured
1997-12-08 Perforation Treatment Performed - Fractured
1997-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-11 Perforation Treatment Performed - Jet Perforation
1997-12-14 Perforation Treatment Performed - Fractured
1997-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-17 Well Log Performed
1997-12-18 Perforation Treatment Performed - Jet Perforation
1997-12-20 Perforation Treatment Performed - Fractured
1997-12-30 Well Log Performed
1997-12-31 Perforation Treatment Performed - Jet Perforation
1998-01-01 Perforation Treatment Performed - Fractured
1998-05-24 Well Log Performed
1998-05-25 Perforation Treatment Performed - Jet Perforation
1998-05-25 Well Log Performed
1998-05-26 Perforation Treatment Performed - Jet Perforation
1998-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-31 Well Log Performed
1998-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-02 Well Log Performed
1999-11-10 Well Began Production
1999-11-10 Well Fluid changed to Gas
1999-11-10 Well Mode changed to Flowing
2005-11-17 Perforation Treatment Performed - Cement Plug
2005-11-17 Plug Back Performed
2005-11-17 Well Fluid changed to Gas
2005-11-17 Well Mode changed to Abandoned Zone
2005-11-19 Well Abandoned
2005-11-19 Well Fluid changed to Gas
2005-11-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-24 Perforation 1496.00 1498.00 14
1997-12-08 Fracture 1450.00 1466.00 0
1997-12-11 Packing Device Capped w/Cement 1446.50 1448.80 0
1997-12-11 Perforation 1436.00 1440.00 20
1997-12-14 Fracture 1436.00 1440.00 0
1997-12-17 Packing Device Capped w/Cement 1423.00 1431.00 0
1997-12-18 Perforation 1068.50 1071.00 20
1997-12-20 Fracture 1068.50 1071.00 0
1997-12-31 Perforation 1068.50 1071.00 20
1998-01-01 Fracture 1068.50 1071.00 0
1998-05-25 Perforation 972.00 972.10 2
1997-11-24 Perforation 1500.00 1502.00 14
1998-05-26 Perforation 963.00 963.10 2
1998-05-26 Perforation 962.00 964.50 18
1998-05-26 Perforation 966.00 968.00 18
1998-05-26 Perforation 971.00 975.00 18
1998-05-30 Acid Treatment 962.00 968.00 0
1998-06-02 Acid Treatment 962.00 964.50 0
2005-11-17 Cement Plug 857.80 1091.50 0
1997-11-24 Perforation 1505.00 1506.50 14
1997-11-25 Acid Treatment 1496.00 1506.50 0
1997-11-29 Packing Device Capped w/Cement 1483.00 1491.50 0
1997-11-29 Perforation 1450.00 1453.00 20
1997-11-30 Perforation 1460.00 1460.20 20
1997-11-30 Perforation 1463.00 1466.00 20
1997-12-02 Fracture 1450.00 1466.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1170 0.0 0.0 0.0
2000 7418 0.0 0.0 0.0
2001 3057 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-10-19 Lost Circulation 112.00 206.00

For data sources see[6]

References