X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795240210023

Well Details

Well ID: 0795240210023
Loading map...
Location: 02/10-02-079-24W5/3
Location Alias: 02/10-02-79-24 W5M
Location Alias 2: 02/10-02-079-24 W5/03
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 24
Section: 02
County/Municipality: Birch Hills County
Well Name: CNRL ET AL CULP 10-2-79-24
Operator Name: Canadian Natural Resources Limited
License Number: 0058141
License Date: 1976-05-11
License Status: Abandoned
Spud Date: 1976-05-21
Final Drill Date: 1976-06-04
Well Total Depth: 1360.90 m
Surface Hole Latitude: 55.821316
Surface Hole Longitude: -117.636193

For data sources see[1][2]

Well History

Date Event
1976-05-11 Obtained License
1976-05-22 Lost Circulation Occurred
1976-05-30 Drill Stem Test Performed
1976-05-31 Drill Stem Test Performed
1976-06-01 Drill Stem Test Performed
1976-06-02 Drill Stem Test Performed
1976-06-04 Finished Drilling
1976-06-05 Drill Stem Test Performed
1976-06-05 Well Log Performed
1976-06-06 Production Casing Operation Performed
1976-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-16 Perforation Treatment Performed - Jet Perforation
1976-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-27 Well Log Performed
1988-09-29 Perforation Treatment Performed - Jet Perforation
1988-09-30 Well Log Performed
1988-10-01 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Log Performed
1989-08-30 Well Mode changed to Drilled and Cased
1990-02-19 Perforation Treatment Performed - Cement Squeeze
1990-02-20 Perforation Treatment Performed - Cement Squeeze
1990-02-21 Perforation Treatment Performed - Cement Squeeze
1990-02-24 Well Log Performed
1990-02-25 Perforation Treatment Performed - Jet Perforation
1990-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-02 Perforation Treatment Performed - Cement Squeeze
1990-03-11 Well Log Performed
1990-03-12 Perforation Treatment Performed - Jet Perforation
1990-03-15 Perforation Treatment Performed - Fractured
1990-03-15 Well Log Performed
1990-05-09 Well Log Performed
1990-05-11 Perforation Treatment Performed - Cement Squeeze
2010-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-06 Plug Back Performed
2010-10-06 Well Log Performed
2010-10-10 Perforation Treatment Performed - Cement Plug
2010-10-10 Plug Back Performed
2010-10-10 Well Mode changed to Abandoned Zone
2010-10-18 Well Abandoned
2010-10-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-16 Perforation 1174.10 1175.30 3
1988-10-01 Perforation 474.90 477.90 13
1988-10-01 Perforation 509.00 510.20 13
1990-02-19 Cement Squeeze 509.00 510.00 0
1990-02-20 Cement Squeeze 474.90 477.90 0
1990-02-21 Cement Squeeze 411.40 454.80 0
1990-02-25 Perforation 457.20 459.90 13
1990-02-26 Acid Treatment 457.20 459.90 0
1990-03-02 Acid Treatment 457.20 459.90 0
1990-03-02 Cement Squeeze 457.20 459.90 0
1990-03-12 Perforation 1139.30 1142.40 13
1976-08-16 Perforation 1168.30 1171.30 3
1990-03-15 Fracture 1139.30 1142.40 0
1990-05-11 Cement Squeeze 1139.30 1142.40 0
2010-10-06 Packing Device Capped w/Cement 1149.40 1157.40 0
2010-10-10 Cement Plug 335.40 1149.40 0
1976-08-16 Perforation 1167.10 1167.70 3
1976-08-16 Perforation 1163.70 1165.90 3
1976-08-16 Acid Treatment 1163.70 1175.30 0
1976-08-26 Acid Treatment 1163.70 1175.30 0
1988-09-29 Perforation 411.40 413.30 13
1988-10-01 Perforation 452.30 454.80 13
1988-10-01 Perforation 457.20 459.90 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-05-22 Lost Circulation 187.80 230.00

For data sources see[5]

References