X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795240111000

Well Details

Well ID: 0795240111000
Loading map...
Location: 00/11-01-079-24W5/0
Location Alias: 00/11-01-79-24 W5M
Location Alias 2: 00/11-01-079-24 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 24
Section: 01
County/Municipality: Birch Hills County
Well Name: CNRL CULP 11-1-79-24
Operator Name: Canadian Natural Resources Limited
License Number: 0056286
License Date: 1975-12-18
License Status: Issued
Spud Date: 1975-12-27
Final Drill Date: 1976-01-12
Well Total Depth: 1347.20 m
Surface Hole Latitude: 55.818451
Surface Hole Longitude: -117.622151

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-18 Obtained License
1976-01-05 Drill Stem Test Performed
1976-01-07 Drill Stem Test Performed
1976-01-08 Drill Stem Test Performed
1976-01-09 Drill Stem Test Performed
1976-01-12 Finished Drilling
1976-01-12 Well Log Performed
1976-01-13 Drill Stem Test Performed
1976-01-14 Production Casing Operation Performed
1976-07-21 Well Mode changed to Drilled and Cased
1976-09-03 Perforation Treatment Performed - Jet Perforation
1976-09-04 Perforation Treatment Performed - Acid Wash - No Pressure
1976-09-07 Perforation Treatment Performed - Jet Perforation
1976-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-09 Well Mode changed to Drilled and Cased
1992-11-20 Well Log Performed
1992-11-22 Perforation Treatment Performed - Cement Squeeze
1992-11-23 Well Log Performed
1992-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-25 Perforation Treatment Performed - Jet Perforation
1992-11-27 Perforation Treatment Performed - Fractured
1992-11-29 Well Log Performed
1993-10-22 Well Began Production
1993-10-22 Well Fluid changed to Gas
1993-10-22 Well Mode changed to Flowing
1997-07-18 Perforation Treatment Performed - Jet Perforation
1997-07-18 Well Log Performed
1997-07-20 Perforation Treatment Performed - Fractured
1997-07-24 Perforation Treatment Performed - Jet Perforation
1997-07-24 Well Log Performed
1997-07-26 Perforation Treatment Performed - Fractured
2002-10-20 Well Log Performed
2002-10-23 Perforation Treatment Performed - Jet Perforation
2002-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-02 Well Fluid changed to Gas
2002-11-02 Well Mode changed to Flowing
2013-03-31 Well Fluid changed to Gas
2013-03-31 Well Mode changed to Suspended
2014-01-02 Well Fluid changed to Gas
2014-01-02 Well Mode changed to Flowing
2016-08-01 Well Fluid changed to Gas
2016-08-01 Well Mode changed to Pumping
2017-03-19 Perforation Treatment Performed - Jet Perforation
2017-03-19 Well Log Performed
2017-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-03 Perforation 1324.70 1328.00 3
1992-11-25 Perforation 1189.00 1189.60 13
1992-11-25 Perforation 1191.80 1196.00 13
1992-11-25 Acid Treatment 1189.00 1196.00 0
1992-11-27 Fracture 1189.00 1196.00 0
1997-07-18 Perforation 1157.30 1165.90 20
1997-07-20 Fracture 1157.30 1165.90 0
1997-07-24 Perforation 1150.90 1152.20 20
1997-07-24 Perforation 1136.30 1140.00 20
1997-07-26 Fracture 1150.90 1152.20 0
1997-07-26 Fracture 1136.30 1140.00 0
1976-09-04 Acid Wash 1324.70 1328.00 0
2002-10-23 Perforation 1324.80 1327.80 20
2002-10-24 Acid Treatment 1324.70 1328.00 0
2017-03-19 Perforation 1191.80 1196.00 17
2017-03-19 Perforation 1189.00 1189.60 17
2017-03-19 Perforation 1162.30 1165.90 17
2017-03-19 Perforation 1157.30 1162.30 17
2017-03-19 Perforation 1150.90 1152.20 17
2017-03-19 Perforation 1136.30 1140.00 17
2017-03-21 Acid Treatment 1136.30 1196.00 0
1976-09-07 Perforation 1197.30 1197.60 3
1976-09-07 Perforation 1199.40 1199.70 3
1976-09-07 Perforation 1202.70 1203.40 3
1976-09-07 Perforation 1208.20 1208.80 3
1976-09-08 Acid Treatment 1199.40 1208.80 0
1976-09-09 Acid Treatment 1199.40 1208.80 0
1992-11-22 Cement Squeeze 1197.30 1208.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1643 0.0 0.0 0.0
1994 8576 0.0 0.0 0.0
1995 8680 0.0 0.0 0.0
1996 8586 0.0 0.0 0.0
1997 4641 0.0 0.0 0.0
1998 5552 0.0 0.0 0.0
1999 8104 0.0 0.0 0.0
2000 8326 0.0 0.0 0.0
2001 8064 0.0 0.0 0.0
2002 1756 0.0 0.0 0.0
2003 8510 0.0 0.0 0.0
2004 8729 0.0 0.0 0.0
2005 8598 0.0 0.0 0.0
2006 8596 0.0 0.0 0.0
2007 8657 0.0 0.0 0.0
2008 8632 0.0 0.0 0.0
2009 8531 0.0 0.0 0.0
2010 8436 0.0 0.0 0.0
2011 8627 0.0 0.0 0.0
2012 2062 0.0 0.0 0.0
2014 8651 0.0 0.0 0.0
2015 8567 0.0 0.0 0.0
2016 8568 0.0 0.0 0.0
2017 2534 0.0 0.0 0.0
2018 8471 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-05-31 No Incident Encountered 0.00 0.00
2017-04-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References