If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0795221608002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.844743,"lon":-117.3705,"icon":""}]} |
Location: 00/08-16-079-22W5/2 | |
Location Alias: 00/08-16-79-22 W5M | |
Location Alias 2: 00/08-16-079-22 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 5 | |
Range: 22 | |
Section: 16 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: CNRL ET AL NVILLE 8-16-79-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0011820 | |
License Date: 1956-07-11 | |
License Status: Suspension | |
Spud Date: 1956-08-14 | |
Final Drill Date: 1956-09-29 | |
Well Total Depth: 2077.20 m | |
Surface Hole Latitude: 55.844743 | |
Surface Hole Longitude: -117.370500 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1956-07-11 | Obtained License |
1956-08-24 | Drill Stem Test Performed |
1956-08-26 | Drill Stem Test Performed |
1956-08-27 | Drill Stem Test Performed |
1956-08-28 | Drill Stem Test Performed |
1956-08-31 | Drill Stem Test Performed |
1956-09-07 | Drill Stem Test Performed |
1956-09-23 | Drill Stem Test Performed |
1956-09-24 | Drill Stem Test Performed |
1956-09-29 | Finished Drilling |
1956-09-29 | Production Casing Operation Performed |
1956-09-29 | Well Mode changed to Drilled and Cased |
1956-10-02 | Perforation Treatment Performed - Bullet Perforation |
1956-10-03 | Drill Stem Test Performed |
1956-10-03 | Perforation Treatment Performed - Jet Perforation |
1956-10-06 | Perforation Treatment Performed - Cement Squeeze |
1956-10-08 | Perforation Treatment Performed - Bullet Perforation |
1956-10-09 | Drill Stem Test Performed |
1956-10-09 | Perforation Treatment Performed - Bullet Perforation |
1956-10-10 | Drill Stem Test Performed |
1956-10-11 | Drill Stem Test Performed |
1956-10-11 | Perforation Treatment Performed - Jet Perforation |
1956-10-15 | Perforation Treatment Performed - Bullet Perforation |
1956-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-10-19 | Perforation Treatment Performed - Jet Perforation |
1956-12-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-12-19 | Perforation Treatment Performed - Bullet Perforation |
1956-12-19 | Perforation Treatment Performed - Cement Squeeze |
1956-12-20 | Perforation Treatment Performed - Bullet Perforation |
1956-12-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-12-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-12-28 | Perforation Treatment Performed - Fractured |
1957-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1957-02-12 | Perforation Treatment Performed - Cement Squeeze |
1957-02-15 | Perforation Treatment Performed - Cement Squeeze |
1957-02-17 | Perforation Treatment Performed - Cement Squeeze |
1957-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1957-02-19 | Perforation Treatment Performed - Jet Perforation |
1957-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-19 | Plug Back Performed |
1998-09-19 | Well Log Performed |
1998-09-20 | Well Log Performed |
1998-09-22 | Perforation Treatment Performed - Jet Perforation |
1998-09-22 | Well Log Performed |
1998-10-23 | Well Began Production |
1998-10-23 | Well Fluid changed to Gas |
1998-10-23 | Well Mode changed to Flowing |
1999-08-01 | Well Fluid changed to Gas |
1999-08-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-10-02 | Bullet Perforation | 1928.20 | 1930.60 | 13 |
1956-10-19 | Acid Treatment | 2052.20 | 2053.70 | 0 |
1956-12-19 | Bullet Perforation | 1764.20 | 1766.90 | 0 |
1956-12-19 | Cement Squeeze | 2034.50 | 2053.70 | 0 |
1956-12-19 | Packing Device Capped w/Cement | 2007.10 | 2007.10 | 0 |
1956-12-20 | Bullet Perforation | 1769.70 | 1772.70 | 7 |
1956-12-20 | Bullet Perforation | 1773.60 | 1777.60 | 7 |
1956-12-23 | Acid Treatment | 1764.20 | 1777.60 | 0 |
1956-12-28 | Acid Treatment | 1764.20 | 1777.60 | 0 |
1956-12-28 | Fracture | 1764.20 | 1777.60 | 0 |
1957-02-09 | Packing Device Capped w/Cement | 1857.80 | 1857.80 | 0 |
1956-10-03 | Perforation | 1918.70 | 1921.50 | 13 |
1957-02-12 | Cement Squeeze | 1764.20 | 1777.60 | 0 |
1957-02-15 | Cement Squeeze | 1764.20 | 1777.60 | 0 |
1957-02-17 | Cement Squeeze | 1764.20 | 1777.60 | 0 |
1957-02-19 | Packing Device Capped w/Cement | 1773.30 | 1773.30 | 0 |
1957-02-19 | Perforation | 1756.30 | 1768.40 | 13 |
1957-02-21 | Acid Treatment | 1756.30 | 1768.40 | 0 |
1957-02-25 | Acid Treatment | 1756.30 | 1768.40 | 0 |
1962-06-01 | Acid Treatment | 1756.30 | 1768.40 | 0 |
1974-07-23 | Acid Treatment | 1756.30 | 1771.50 | 0 |
1998-09-19 | Packing Device Capped w/Cement | 1741.00 | 1749.00 | 0 |
1956-10-06 | Cement Squeeze | 1918.70 | 1930.60 | 0 |
1998-09-19 | Packing Device Capped w/Cement | 1022.00 | 1030.00 | 0 |
1998-09-22 | Perforation | 931.00 | 932.50 | 18 |
1956-10-08 | Bullet Perforation | 2037.60 | 2042.20 | 13 |
1956-10-09 | Bullet Perforation | 2042.20 | 2048.30 | 13 |
1956-10-11 | Perforation | 2048.30 | 2051.30 | 13 |
1956-10-15 | Bullet Perforation | 2051.30 | 2052.80 | 0 |
1956-10-16 | Acid Treatment | 2037.60 | 2051.30 | 0 |
1956-10-19 | Perforation | 2052.20 | 2053.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 1666 | 0.0 | 0.0 | 0.0 |
1999 | 3954 | 0.0 | 0.0 | 0.0 |
For data sources see[5]