X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795221608000

Well Details

Well ID: 0795221608000
Loading map...
Location: 00/08-16-079-22W5/0
Location Alias: 00/08-16-79-22 W5M
Location Alias 2: 00/08-16-079-22 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 22
Section: 16
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL ET AL NVILLE 8-16-79-22
Operator Name: Canadian Natural Resources Limited
License Number: 0011820
License Date: 1956-07-11
License Status: Suspension
Spud Date: 1956-08-14
Final Drill Date: 1956-09-29
Well Total Depth: 2077.20 m
Surface Hole Latitude: 55.844743
Surface Hole Longitude: -117.370500

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-11 Obtained License
1956-08-24 Drill Stem Test Performed
1956-08-26 Drill Stem Test Performed
1956-08-27 Drill Stem Test Performed
1956-08-28 Drill Stem Test Performed
1956-08-31 Drill Stem Test Performed
1956-09-07 Drill Stem Test Performed
1956-09-23 Drill Stem Test Performed
1956-09-24 Drill Stem Test Performed
1956-09-29 Finished Drilling
1956-09-29 Production Casing Operation Performed
1956-09-29 Well Mode changed to Drilled and Cased
1956-10-02 Perforation Treatment Performed - Bullet Perforation
1956-10-03 Drill Stem Test Performed
1956-10-03 Perforation Treatment Performed - Jet Perforation
1956-10-06 Perforation Treatment Performed - Cement Squeeze
1956-10-08 Perforation Treatment Performed - Bullet Perforation
1956-10-09 Drill Stem Test Performed
1956-10-09 Perforation Treatment Performed - Bullet Perforation
1956-10-10 Drill Stem Test Performed
1956-10-11 Drill Stem Test Performed
1956-10-11 Perforation Treatment Performed - Jet Perforation
1956-10-15 Perforation Treatment Performed - Bullet Perforation
1956-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-19 Perforation Treatment Performed - Jet Perforation
1956-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-12-19 Perforation Treatment Performed - Bullet Perforation
1956-12-19 Perforation Treatment Performed - Cement Squeeze
1956-12-20 Perforation Treatment Performed - Bullet Perforation
1956-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-28 Perforation Treatment Performed - Fractured
1957-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-02-12 Perforation Treatment Performed - Cement Squeeze
1957-02-15 Perforation Treatment Performed - Cement Squeeze
1957-02-17 Perforation Treatment Performed - Cement Squeeze
1957-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-02-19 Perforation Treatment Performed - Jet Perforation
1957-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-03-02 Well Began Production
1957-03-02 Well Fluid changed to Crude Oil
1957-03-02 Well Mode changed to Flowing
1962-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-03 Well Fluid changed to Crude Oil
1962-06-03 Well Mode changed to Pumping
1974-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-19 Plug Back Performed
1998-09-19 Well Fluid changed to Crude Oil
1998-09-19 Well Log Performed
1998-09-19 Well Mode changed to Abandoned Zone
1998-09-20 Well Log Performed
1998-09-22 Perforation Treatment Performed - Jet Perforation
1998-09-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-10-02 Bullet Perforation 1928.20 1930.60 13
1956-10-19 Acid Treatment 2052.20 2053.70 0
1956-12-19 Bullet Perforation 1764.20 1766.90 0
1956-12-19 Cement Squeeze 2034.50 2053.70 0
1956-12-19 Packing Device Capped w/Cement 2007.10 2007.10 0
1956-12-20 Bullet Perforation 1769.70 1772.70 7
1956-12-20 Bullet Perforation 1773.60 1777.60 7
1956-12-23 Acid Treatment 1764.20 1777.60 0
1956-12-28 Acid Treatment 1764.20 1777.60 0
1956-12-28 Fracture 1764.20 1777.60 0
1957-02-09 Packing Device Capped w/Cement 1857.80 1857.80 0
1956-10-03 Perforation 1918.70 1921.50 13
1957-02-12 Cement Squeeze 1764.20 1777.60 0
1957-02-15 Cement Squeeze 1764.20 1777.60 0
1957-02-17 Cement Squeeze 1764.20 1777.60 0
1957-02-19 Packing Device Capped w/Cement 1773.30 1773.30 0
1957-02-19 Perforation 1756.30 1768.40 13
1957-02-21 Acid Treatment 1756.30 1768.40 0
1957-02-25 Acid Treatment 1756.30 1768.40 0
1962-06-01 Acid Treatment 1756.30 1768.40 0
1974-07-23 Acid Treatment 1756.30 1771.50 0
1998-09-19 Packing Device Capped w/Cement 1741.00 1749.00 0
1956-10-06 Cement Squeeze 1918.70 1930.60 0
1998-09-19 Packing Device Capped w/Cement 1022.00 1030.00 0
1998-09-22 Perforation 931.00 932.50 18
1956-10-08 Bullet Perforation 2037.60 2042.20 13
1956-10-09 Bullet Perforation 2042.20 2048.30 13
1956-10-11 Perforation 2048.30 2051.30 13
1956-10-15 Bullet Perforation 2051.30 2052.80 0
1956-10-16 Acid Treatment 2037.60 2051.30 0
1956-10-19 Perforation 2052.20 2053.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 1884 0.0 0.0 0.0
1970 3646 0.0 0.0 0.0
1971 4982 0.0 0.0 0.0
1972 6412 0.0 0.0 0.0
1973 8245 0.0 0.0 0.0
1974 7036 0.0 0.0 0.0
1975 8556 0.0 0.0 0.0
1976 8678 0.0 0.0 0.0
1977 8234 0.0 0.0 0.0
1978 8474 0.0 0.0 0.0
1979 8125 0.0 0.0 0.0
1980 8625 0.0 0.0 0.0
1981 8711 0.0 0.0 0.0
1982 8581 0.0 0.0 0.0
1983 8596 0.0 0.0 0.0
1984 8362 0.0 0.0 0.0
1985 8004 0.0 0.0 0.0
1986 8081 0.0 0.0 0.0
1987 8472 0.0 0.0 0.0
1988 8628 0.0 0.0 0.0
1989 8553 0.0 0.0 0.0
1990 8655 0.0 0.0 0.0
1991 7797 0.0 0.0 0.0
1992 5644 0.0 0.0 0.0
1993 7415 0.0 0.0 0.0
1994 8012 0.0 0.0 0.0
1995 8660 0.0 0.0 0.0
1996 8742 0.0 0.0 0.0
1997 8724 0.0 0.0 0.0
1998 3624 0.0 0.0 0.0

For data sources see[5]

References