X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795220916002

Well Details

Well ID: 0795220916002
Loading map...
Location: 00/16-09-079-22W5/2
Location Alias: 00/16-09-79-22 W5M
Location Alias 2: 00/16-09-079-22 W5/02
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 22
Section: 09
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL ET AL NVILLE 16-9-79-22
Operator Name: Canadian Natural Resources Limited
License Number: 0012839
License Date: 1956-12-27
License Status: Suspension
Spud Date: 1957-01-11
Final Drill Date: 1957-02-27
Well Total Depth: 2324.70 m
Surface Hole Latitude: 55.837879
Surface Hole Longitude: -117.371475

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-12-27 Obtained License
1957-01-15 Drill Stem Test Performed
1957-01-17 Drill Stem Test Performed
1957-01-20 Drill Stem Test Performed
1957-02-19 Drill Stem Test Performed
1957-02-27 Finished Drilling
1957-03-03 Drill Stem Test Performed
1957-03-04 Drill Stem Test Performed
1957-03-05 Drill Stem Test Performed
1957-03-06 Drill Stem Test Performed
1957-03-07 Drill Stem Test Performed
1957-03-09 Production Casing Operation Performed
1957-05-21 Perforation Treatment Performed - Jet Perforation
1957-05-23 Perforation Treatment Performed - Acid Wash - No Pressure
1957-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-05-23 Perforation Treatment Performed - Jet Perforation
1957-05-24 Perforation Treatment Performed - Acid Wash - No Pressure
1957-05-28 Perforation Treatment Performed - Jet Perforation
1957-05-30 Perforation Treatment Performed - Cement Squeeze
1957-06-02 Perforation Treatment Performed - Cement Squeeze
1957-06-03 Perforation Treatment Performed - Cement Squeeze
1957-09-16 Perforation Treatment Performed - Cement Squeeze
1957-09-19 Perforation Treatment Performed - Cement Squeeze
1957-09-20 Perforation Treatment Performed - Bullet Perforation
1957-09-22 Perforation Treatment Performed - Acid Wash - No Pressure
1957-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-09-23 Perforation Treatment Performed - Jet Perforation
1957-09-24 Perforation Treatment Performed - Acid Wash - No Pressure
1959-08-19 Perforation Treatment Performed - Cement Squeeze
1959-08-19 Perforation Treatment Performed - Jet Perforation
1984-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-08 Plug Back Performed
1984-12-08 Well Log Performed
1984-12-09 Perforation Treatment Performed - Jet Perforation
1984-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-24 Well Mode changed to Drilled and Cased
1993-04-30 Perforation Treatment Performed - Jet Perforation
1993-05-01 Well Log Performed
1993-05-03 Perforation Treatment Performed - Jet Perforation
1993-05-03 Well Log Performed
1993-05-05 Perforation Treatment Performed - Cement Squeeze
1993-05-06 Well Log Performed
1993-05-08 Perforation Treatment Performed - Jet Perforation
1993-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-11 Well Log Performed
1993-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-12 Perforation Treatment Performed - Jet Perforation
1993-05-12 Plug Back Performed
1993-05-14 Well Log Performed
1993-05-15 Perforation Treatment Performed - Jet Perforation
1993-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-20 Well Began Production
1993-11-20 Well Fluid changed to Gas
1993-11-20 Well Mode changed to Flowing
1994-06-28 Well Log Performed
1994-06-30 Perforation Treatment Performed - Fractured
1994-07-03 Well Log Performed
1994-07-15 Well Log Performed
1994-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-14 Perforation Treatment Performed - Fractured
1995-10-18 Well Log Performed
1999-01-13 Well Fluid changed to Gas
1999-01-13 Well Mode changed to Flowing
2001-05-31 Perforation Treatment Performed - Jet Perforation
2001-05-31 Well Log Performed
2014-07-31 Well Fluid changed to Gas
2014-07-31 Well Mode changed to Suspended
2017-12-01 Well Fluid changed to Gas
2017-12-01 Well Mode changed to Flowing
2018-08-31 Well Fluid changed to Gas
2018-08-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-05-21 Perforation 1763.00 1772.70 13
1957-09-16 Cement Squeeze 1046.10 1049.70 0
1957-09-19 Cement Squeeze 1046.10 1049.70 0
1957-09-20 Bullet Perforation 1097.30 1105.50 13
1957-09-22 Acid Wash 1097.30 1105.50 0
1957-09-23 Packing Device Capped w/Cement 1093.60 1093.60 0
1957-09-23 Perforation 1058.30 1062.80 7
1957-09-24 Acid Wash 1058.30 1062.80 0
1959-08-19 Cement Squeeze 1058.30 1062.80 0
1959-08-19 Perforation 1097.30 1105.50 13
1959-08-19 Cement Squeeze 1097.30 1105.50 0
1957-05-23 Acid Wash 1763.00 1772.70 0
1959-08-19 Perforation 1046.10 1049.70 13
1984-12-08 Packing Device Capped w/Cement 1027.00 1030.00 0
1984-12-09 Perforation 1012.50 1015.60 13
1984-12-10 Acid Treatment 1012.50 1015.60 0
1993-04-30 Perforation 1046.10 1049.70 13
1993-05-03 Perforation 1097.30 1105.50 13
1993-05-05 Cement Squeeze 1097.30 1105.50 0
1993-05-08 Perforation 1096.30 1099.50 13
1993-05-09 Acid Treatment 1096.30 1099.50 0
1993-05-12 Packing Device Capped w/Cement 1082.00 1090.00 0
1957-05-23 Packing Device Capped w/Cement 1752.60 1752.60 0
1993-05-12 Perforation 1063.50 1069.00 13
1993-05-15 Perforation 1044.80 1048.80 13
1993-05-16 Acid Treatment 1044.80 1049.70 0
1993-05-21 Acid Treatment 1063.50 1069.00 0
1994-06-30 Fracture 1044.80 1069.00 0
1994-07-21 Acid Treatment 1063.50 1069.00 0
1995-10-14 Fracture 1063.50 1069.00 0
2001-05-31 Perforation 1063.50 1069.00 17
2001-05-31 Perforation 1045.00 1048.00 17
1957-05-23 Perforation 1046.10 1049.70 13
1957-05-24 Acid Wash 1046.10 1049.70 0
1957-05-28 Perforation 754.70 757.70 13
1957-05-30 Cement Squeeze 754.70 757.70 0
1957-06-02 Cement Squeeze 754.70 757.70 0
1957-06-03 Cement Squeeze 754.70 757.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1019 0.0 0.0 0.0
1994 7086 0.0 0.0 0.0
1995 5952 0.0 0.0 0.0
1999 7084 0.0 0.0 0.0
2000 7999 0.0 0.0 0.0
2001 6911 0.0 0.0 0.0
2002 7629 0.0 0.0 0.0
2003 2328 0.0 0.0 0.0
2010 1 0.0 0.0 0.0
2017 1 0.0 0.0 0.0
2018 2 0.0 0.0 0.0

For data sources see[5]

References