X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795220911003

Well Details

Well ID: 0795220911003
Loading map...
Location: 00/11-09-079-22W5/3
Location Alias: 00/11-09-79-22 W5M
Location Alias 2: 00/11-09-079-22 W5/03
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 22
Section: 09
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL ET AL NVILLE 11-9-79-22
Operator Name: Canadian Natural Resources Limited
License Number: 0015997
License Date: 1958-10-06
License Status: Issued
Spud Date: 1958-10-09
Final Drill Date: 1958-11-17
Well Total Depth: 2093.40 m
Surface Hole Latitude: 55.834706
Surface Hole Longitude: -117.385181

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-06 Obtained License
1958-10-29 Drill Stem Test Performed
1958-10-30 Drill Stem Test Performed
1958-11-15 Drill Stem Test Performed
1958-11-17 Drill Stem Test Performed
1958-11-17 Finished Drilling
1958-11-17 Well Mode changed to Drilled and Cased
1958-11-20 Production Casing Operation Performed
1958-11-22 Perforation Treatment Performed - Open-Hole Completion
1958-11-23 Perforation Treatment Performed - Acid Wash - No Pressure
1959-02-07 Perforation Treatment Performed - Jet Perforation
1959-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-05-23 Perforation Treatment Performed - Cement Squeeze
1969-05-24 Perforation Treatment Performed - Cement Squeeze
1969-05-26 Perforation Treatment Performed - Selective Jet Perforations
1969-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-16 Well Log Performed
1991-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-23 Perforation Treatment Performed - Jet Perforation
1991-06-23 Well Log Performed
1991-06-24 Plug Back Performed
1991-06-26 Perforation Treatment Performed - Fractured
1991-06-30 Well Log Performed
1991-07-01 Well Log Performed
1991-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-01 Plug Back Performed
1991-08-02 Perforation Treatment Performed - Fractured
1991-08-02 Perforation Treatment Performed - Jet Perforation
1991-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-01 Well Began Production
1992-10-01 Well Fluid changed to Gas
1992-10-01 Well Mode changed to Flowing
1994-07-09 Perforation Treatment Performed - Fractured
1994-07-10 Well Log Performed
1996-02-08 Well Log Performed
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-02-11 Perforation Treatment Performed - Fractured
1996-02-12 Well Log Performed
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Pumping
2012-06-29 Well Fluid changed to Gas
2012-06-29 Well Mode changed to Suspended
2015-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Pumping
2017-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-11-22 Open Hole/Barefoot Completion 2034.20 2050.10 0
1991-06-23 Packing Device Capped w/Cement 1749.00 1757.00 0
1991-06-23 Perforation 1106.00 1110.00 13
1991-06-26 Fracture 1106.00 1110.00 0
1991-08-01 Packing Device Capped w/Cement 1092.00 1100.00 0
1991-08-02 Perforation 1064.00 1066.40 13
1991-08-02 Fracture 1064.00 1066.40 0
1991-08-04 Acid Treatment 1064.00 1066.40 0
1994-07-09 Fracture 1064.00 1066.40 0
1996-02-09 Perforation 1042.00 1049.00 18
1996-02-11 Fracture 1042.00 1049.00 0
1958-11-23 Acid Wash 2034.20 2050.10 0
2015-12-14 Acid Treatment 1042.00 1066.40 0
2017-02-16 Acid Treatment 1042.00 1066.40 0
1959-02-07 Perforation 1758.70 1767.80 13
1959-02-08 Acid Treatment 1758.70 1767.80 0
1967-05-30 Packing Device Capped w/Cement 1911.70 1911.70 0
1969-05-23 Cement Squeeze 1758.70 1767.80 0
1969-05-24 Cement Squeeze 1758.70 1767.80 0
1969-05-26 Selective Jet Perforations 1759.60 1762.70 0
1969-06-19 Acid Treatment 1759.60 1762.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1547 0.0 0.0 0.0
1993 4060 0.0 0.0 0.0
1994 4732 0.0 0.0 0.0
1995 8589 0.0 0.0 0.0
1996 7365 0.0 0.0 0.0
1997 7131 0.0 0.0 0.0
1998 7814 0.0 0.0 0.0
1999 8149 0.0 0.0 0.0
2000 8635 0.0 0.0 0.0
2001 8703 0.0 0.0 0.0
2002 8431 0.0 0.0 0.0
2003 8542 0.0 0.0 0.0
2004 8391 0.0 0.0 0.0
2005 8479 0.0 0.0 0.0
2006 7887 0.0 0.0 0.0
2007 7967 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8495 0.0 0.0 0.0
2010 8452 0.0 0.0 0.0
2011 3911 0.0 0.0 0.0
2016 5749 0.0 0.0 0.0
2017 6514 0.0 0.0 0.0
2018 8485 0.0 0.0 0.0
2019 7704 0.0 0.0 0.0
2020 1964 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References