X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795220805000

Well Details

Well ID: 0795220805000
Loading map...
Location: 00/05-08-079-22W5/0
Location Alias: 00/05-08-79-22 W5M
Location Alias 2: 00/05-08-079-22 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 22
Section: 08
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL ET AL NVILLE 5-8-79-22
Operator Name: Canadian Natural Resources Limited
License Number: 0015272
License Date: 1958-05-29
License Status: Issued
Spud Date: 1958-06-02
Final Drill Date: 1958-07-06
Well Total Depth: 2103.10 m
Surface Hole Latitude: 55.831082
Surface Hole Longitude: -117.416962

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-05-29 Obtained License
1958-06-09 Drill Stem Test Performed
1958-06-25 Drill Stem Test Performed
1958-06-28 Drill Stem Test Performed
1958-07-05 Drill Stem Test Performed
1958-07-06 Finished Drilling
1958-07-06 Well Mode changed to Drilled and Cased
1958-07-07 Drill Stem Test Performed
1958-07-09 Drill Stem Test Performed
1958-07-10 Production Casing Operation Performed
1958-07-25 Perforation Treatment Performed - Open-Hole Completion
1958-07-25 Well Began Production
1958-07-25 Well Fluid changed to Crude Oil
1958-07-25 Well Mode changed to Flowing
1971-03-26 Perforation Treatment Performed - Jet Perforation
1971-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1980-09-30 Well Fluid changed to Crude Oil
1980-09-30 Well Mode changed to Suspended
1986-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-07 Plug Back Performed
1986-10-07 Well Fluid changed to Crude Oil
1986-10-07 Well Log Performed
1986-10-07 Well Mode changed to Abandoned Zone
1986-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-09 Well Log Performed
1986-10-10 Perforation Treatment Performed - Jet Perforation
1986-10-10 Well Log Performed
1986-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-07-25 Open Hole/Barefoot Completion 2030.00 2048.30 0
1986-10-11 Acid Treatment 975.40 996.10 0
1990-05-17 Acid Treatment 975.40 996.10 0
1991-01-17 Acid Treatment 975.40 996.10 0
1991-07-05 Acid Treatment 975.40 996.10 0
1991-09-26 Acid Treatment 975.40 996.00 0
1992-07-09 Acid Treatment 975.40 982.10 0
1992-12-10 Acid Treatment 975.40 996.10 0
1993-03-02 Acid Treatment 975.40 996.10 0
1993-06-09 Acid Treatment 975.40 996.10 0
1993-12-16 Acid Treatment 975.40 996.10 0
1971-03-26 Perforation 2034.80 2036.40 7
1994-01-26 Acid Treatment 975.40 996.10 0
1994-06-10 Acid Treatment 975.40 996.10 0
1971-03-29 Acid Treatment 2034.80 2036.40 0
1986-10-07 Packing Device Capped w/Cement 1992.10 2006.70 0
1986-10-09 Packing Device Capped w/Cement 1085.00 1085.00 0
1986-10-10 Perforation 975.40 982.10 13
1986-10-10 Perforation 983.60 985.70 13
1986-10-10 Perforation 987.60 990.00 13
1986-10-10 Perforation 993.60 996.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5693 0.0 0.0 0.0
1968 6720 0.0 0.0 0.0
1969 8039 0.0 0.0 0.0
1970 2019 0.0 0.0 0.0
1971 4119 0.0 0.0 0.0
1972 7080 0.0 0.0 0.0
1973 7874 0.0 0.0 0.0
1974 6093 0.0 0.0 0.0
1975 4692 0.0 0.0 0.0
1976 5146 0.0 0.0 0.0
1977 6683 0.0 0.0 0.0
1978 1844 0.0 0.0 0.0
1979 5819 0.0 0.0 0.0
1980 3863 0.0 0.0 0.0

For data sources see[5]

References