X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795082304000

Well Details

Well ID: 0795082304000
Loading map...
Location: 00/04-23-079-08W5/0
Location Alias: 00/04-23-79-08 W5M
Location Alias 2: 00/04-23-079-08 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 08
Section: 23
County/Municipality: Northern Sunrise County
Well Name: AMOCO ET AL NIPISI 4-23-79-8
Operator Name: Canadian Natural Resources Limited
License Number: 0028093
License Date: 1965-04-06
License Status: Suspension
Spud Date: 1965-04-25
Final Drill Date: 1965-05-10
Well Total Depth: 1880.90 m
Surface Hole Latitude: 55.855686
Surface Hole Longitude: -115.146101

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-04-06 Obtained License
1965-05-10 Finished Drilling
1965-05-10 Well Mode changed to Drilled and Cased
1965-05-11 Production Casing Operation Performed
1965-05-12 Perforation Treatment Performed - Jet Perforation
1965-06-21 Well Began Production
1965-06-21 Well Fluid changed to Crude Oil
1965-06-21 Well Mode changed to Flowing
1969-10-18 Perforation Treatment Performed - Jet Perforation
1969-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-29 Well Fluid changed to Crude Oil
1975-05-29 Well Mode changed to Pumping
1984-05-05 Well Log Performed
1985-12-18 Perforation Treatment Performed - Jet Perforation
1985-12-18 Well Log Performed
1985-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-01 Perforation Treatment Performed - Cement Squeeze
1993-03-08 Well Log Performed
1993-03-19 Well Log Performed
1993-03-20 Perforation Treatment Performed - Jet Perforation
2002-04-01 Well Fluid changed to Crude Oil
2002-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-05-12 Perforation 1726.10 1727.90 7
1993-03-01 Cement Squeeze 1726.10 1741.00 0
1993-03-20 Perforation 1724.00 1727.00 13
1965-05-12 Perforation 1730.00 1731.60 7
1965-05-12 Perforation 1732.50 1733.40 7
1969-10-18 Perforation 1727.00 1728.20 7
1969-10-18 Perforation 1730.70 1731.30 7
1969-10-18 Perforation 1732.50 1734.60 7
1969-10-24 Acid Treatment 1727.00 1734.60 0
1985-12-18 Perforation 1734.20 1741.00 13
1985-12-19 Acid Treatment 1726.10 1741.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 531 0.0 0.0 0.0
1968 456 0.0 0.0 0.0
1969 7800 0.0 0.0 0.0
1970 7898 0.0 0.0 0.0
1971 7129 0.0 0.0 0.0
1972 8343 0.0 0.0 0.0
1973 8635 0.0 0.0 0.0
1974 6581 0.0 0.0 0.0
1975 2012 0.0 0.0 0.0
1976 3524 0.0 0.0 0.0
1977 3624 0.0 0.0 0.0
1978 8215 0.0 0.0 0.0
1979 5636 0.0 0.0 0.0
1980 2482 0.0 0.0 0.0
1981 5958 0.0 0.0 0.0
1982 5934 0.0 0.0 0.0
1983 7418 0.0 0.0 0.0
1984 4360 0.0 0.0 0.0
1985 7874 0.0 0.0 0.0
1986 8087 0.0 0.0 0.0
1987 8299 0.0 0.0 0.0
1988 8619 0.0 0.0 0.0
1989 7827 0.0 0.0 0.0
1990 6022 0.0 0.0 0.0
1991 2595 0.0 0.0 0.0
1992 3325 0.0 0.0 0.0
1993 4844 0.0 0.0 0.0
1994 2950 0.0 0.0 0.0

For data sources see[5]

References