If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0795081703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.842217,"lon":-115.220634,"icon":""}]} |
Location: 00/03-17-079-08W5/0 | |
Location Alias: 00/03-17-79-08 W5M | |
Location Alias 2: 00/03-17-079-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 5 | |
Range: 08 | |
Section: 17 | |
County/Municipality: Northern Sunrise County | |
Well Name: ANTERRA NIPISI 3-17-79-8 | |
Operator Name: Anterra Energy Inc. | |
License Number: 0142796 | |
License Date: 1990-01-16 | |
License Status: Suspension | |
Spud Date: 1990-01-20 | |
Final Drill Date: 1990-02-04 | |
Well Total Depth: 1782.00 m | |
Surface Hole Latitude: 55.842217 | |
Surface Hole Longitude: -115.220634 |
Date | Event |
---|---|
1990-01-16 | Obtained License |
1990-01-21 | Surface Casing Operation Performed |
1990-02-04 | Finished Drilling |
1990-02-04 | Well Mode changed to Drilled and Cased |
1990-02-05 | Well Log Performed |
1990-02-07 | Production Casing Operation Performed |
1990-02-07 | Rig Released |
1990-02-18 | Perforation Treatment Performed - Jet Perforation |
1990-02-26 | Well Began Production |
1990-02-26 | Well Fluid changed to Crude Oil |
1990-02-26 | Well Mode changed to Pumping |
1998-12-12 | Perforation Treatment Performed - Jet Perforation |
1998-12-12 | Well Log Performed |
2001-05-05 | Perforation Treatment Performed - Chemical Squeeze |
2006-08-03 | Well Fluid changed to Crude Oil |
2006-08-03 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-02-18 | Perforation | 1734.00 | 1736.50 | 13 |
1990-02-18 | Perforation | 1737.00 | 1738.00 | 13 |
1998-12-12 | Perforation | 1751.00 | 1752.00 | 20 |
1998-12-12 | Perforation | 1741.00 | 1742.00 | 20 |
1998-12-12 | Perforation | 1744.00 | 1745.00 | 20 |
2001-05-05 | Chemical Squeeze | 1734.00 | 1736.50 | 0 |
2001-05-05 | Chemical Squeeze | 1737.00 | 1738.00 | 0 |
2001-05-05 | Chemical Squeeze | 1751.00 | 1752.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 6808 | 0.0 | 0.0 | 0.0 |
1991 | 8163 | 0.0 | 0.0 | 0.0 |
1992 | 8413 | 0.0 | 0.0 | 0.0 |
1993 | 8637 | 0.0 | 0.0 | 0.0 |
1994 | 8448 | 0.0 | 0.0 | 0.0 |
1995 | 8184 | 0.0 | 0.0 | 0.0 |
1996 | 6158 | 0.0 | 0.0 | 0.0 |
1997 | 8755 | 0.0 | 0.0 | 0.0 |
1998 | 5228 | 0.0 | 0.0 | 0.0 |
1999 | 8540 | 0.0 | 0.0 | 0.0 |
2000 | 7205 | 0.0 | 0.0 | 0.0 |
2001 | 7949 | 0.0 | 0.0 | 0.0 |
2002 | 5974 | 0.0 | 0.0 | 0.0 |
2003 | 1629 | 0.0 | 0.0 | 0.0 |
2004 | 2124 | 0.0 | 0.0 | 0.0 |
2005 | 2678 | 0.0 | 0.0 | 0.0 |
2006 | 2911 | 0.0 | 0.0 | 0.0 |
For data sources see[5]