X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795071802000

Well Details

Well ID: 0795071802000
Loading map...
Location: 00/02-18-079-07W5/0
Location Alias: 00/02-18-79-07 W5M
Location Alias 2: 00/02-18-079-07 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 07
Section: 18
County/Municipality: Northern Sunrise County
Well Name: LASMO NIPISI 2-18-79-7
Operator Name: Canadian Natural Resources Limited
License Number: 0029563
License Date: 1965-12-08
License Status: Suspension
Spud Date: 1966-03-19
Final Drill Date: 1966-04-06
Well Total Depth: 1732.20 m
Surface Hole Latitude: 55.841691
Surface Hole Longitude: -115.080475

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-08 Obtained License
1966-04-06 Finished Drilling
1966-04-06 Well Mode changed to Drilled and Cased
1966-04-07 Production Casing Operation Performed
1966-05-02 Perforation Treatment Performed - Bullet Perforation
1966-05-02 Well Began Production
1966-05-02 Well Fluid changed to Crude Oil
1966-05-02 Well Mode changed to Flowing
1970-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-14 Well Fluid changed to Crude Oil
1973-06-14 Well Mode changed to Pumping
1973-12-04 Perforation Treatment Performed - Jet Perforation
1973-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-09-30 Well Fluid changed to Crude Oil
2014-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-05-02 Bullet Perforation 1699.90 1701.40 3
1966-05-02 Bullet Perforation 1702.30 1703.80 3
1970-01-02 Acid Treatment 1699.90 1703.80 0
1973-12-04 Perforation 1699.00 1701.40 7
1973-12-04 Perforation 1702.30 1703.80 7
1973-12-04 Perforation 1707.20 1708.40 7
1973-12-05 Acid Treatment 1699.00 1708.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5700 0.0 0.0 0.0
1968 6753 0.0 0.0 0.0
1969 2648 0.0 0.0 0.0
1970 6382 0.0 0.0 0.0
1971 3872 0.0 0.0 0.0
1972 7794 0.0 0.0 0.0
1973 7108 0.0 0.0 0.0
1974 7309 0.0 0.0 0.0
1975 4360 0.0 0.0 0.0
1976 5675 0.0 0.0 0.0
1977 2080 0.0 0.0 0.0
1978 3280 0.0 0.0 0.0
1979 5638 0.0 0.0 0.0
1980 6626 0.0 0.0 0.0
1981 8093 0.0 0.0 0.0
1982 8141 0.0 0.0 0.0
1983 8464 0.0 0.0 0.0
1984 7615 0.0 0.0 0.0
1985 7866 0.0 0.0 0.0
1986 7861 0.0 0.0 0.0
1987 7818 0.0 0.0 0.0
1988 8584 0.0 0.0 0.0
1989 8131 0.0 0.0 0.0
1990 8671 0.0 0.0 0.0
1991 8584 0.0 0.0 0.0
1992 8231 0.0 0.0 0.0
1993 5881 0.0 0.0 0.0
1994 8408 0.0 0.0 0.0
1995 8173 0.0 0.0 0.0
1996 8619 0.0 0.0 0.0
1997 8091 0.0 0.0 0.0
1998 7742 0.0 0.0 0.0
1999 8144 0.0 0.0 0.0
2000 8088 0.0 0.0 0.0
2001 8276 0.0 0.0 0.0
2002 7057 0.0 0.0 0.0
2003 8554 0.0 0.0 0.0
2004 8452 0.0 0.0 0.0
2005 2586 0.0 0.0 0.0
2006 5712 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 7869 0.0 0.0 0.0
2009 8355 0.0 0.0 0.0
2010 8675 0.0 0.0 0.0
2011 7924 0.0 0.0 0.0
2012 7609 0.0 0.0 0.0
2013 8403 0.0 0.0 0.0
2014 1772 0.0 0.0 0.0

For data sources see[5]

References