If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786130114002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.735008,"lon":-119.875671,"icon":""}]} |
Location: 00/14-01-078-13W6/2 | |
Location Alias: 00/14-01-78-13 W6M | |
Location Alias 2: 00/14-01-078-13 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 01 | |
County/Municipality: Saddle Hills County | |
Well Name: SLE PCOUPES 14-1-78-13 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0217445 | |
License Date: 1998-09-09 | |
License Status: Issued | |
Spud Date: 1998-09-21 | |
Final Drill Date: 1998-10-06 | |
Well Total Depth: 2030.00 m | |
Surface Hole Latitude: 55.735008 | |
Surface Hole Longitude: -119.875671 |
Date | Event |
---|---|
1998-09-09 | Obtained License |
1998-09-23 | Surface Casing Operation Performed |
1998-10-06 | Finished Drilling |
1998-10-06 | Well Log Performed |
1998-10-06 | Well Mode changed to Drilled and Cased |
1998-10-07 | Drill Stem Test Performed |
1998-10-07 | Well Log Performed |
1998-10-08 | Drill Stem Test Performed |
1998-10-10 | Drill Stem Test Performed |
1998-10-11 | Production Casing Operation Performed |
1998-10-12 | Rig Released |
1998-11-17 | Perforation Treatment Performed - Jet Perforation |
1999-01-26 | Perforation Treatment Performed - Jet Perforation |
1999-01-26 | Well Log Performed |
1999-11-06 | Well Began Production |
1999-11-06 | Well Fluid changed to Gas |
1999-11-06 | Well Mode changed to Flowing |
2003-05-11 | Well Fluid changed to Gas |
2003-05-11 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-11-17 | Perforation | 1985.00 | 1988.00 | 13 |
1999-01-26 | Perforation | 1530.00 | 1536.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 1165 | 0.0 | 0.0 | 0.0 |
2000 | 7187 | 0.0 | 0.0 | 0.0 |
2001 | 2467 | 0.0 | 0.0 | 0.0 |
2002 | 679 | 0.0 | 0.0 | 0.0 |
2003 | 2623 | 0.0 | 0.0 | 0.0 |
For data sources see[5]