X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786092014002

Well Details

Well ID: 0786092014002
Loading map...
Location: 00/14-20-078-09W6/2
Location Alias: 00/14-20-78-09 W6M
Location Alias 2: 00/14-20-078-09 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 09
Section: 20
County/Municipality: Saddle Hills County
Well Name: MOBIL-GC ET AL PROGRESS 14-20-78-9
Operator Name: ExxonMobil Canada Ltd.
License Number: 0110677
License Date: 1984-11-12
License Status: RecCertified
Spud Date: 1984-11-19
Final Drill Date: 1984-11-28
Well Total Depth: 1746.00 m
Surface Hole Latitude: 55.780909
Surface Hole Longitude: -119.363465

For data sources see[1][2]

Well History

Date Event
1984-11-12 Obtained License
1984-11-20 Surface Casing Operation Performed
1984-11-28 Finished Drilling
1984-11-28 Well Mode changed to Drilled and Cased
1984-11-29 Well Log Performed
1984-11-30 Drill Stem Test Performed
1984-11-30 Well Log Performed
1984-12-01 Drill Stem Test Performed
1984-12-02 Production Casing Operation Performed
1984-12-02 Rig Released
1984-12-12 Perforation Treatment Performed - Jet Perforation
1984-12-12 Well Log Performed
1984-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-15 Perforation Treatment Performed - Fractured
1985-02-23 Well Log Performed
1985-02-26 Perforation Treatment Performed - Jet Perforation
1985-02-26 Well Log Performed
1985-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-07 Perforation Treatment Performed - Fractured
1985-03-07 Perforation Treatment Performed - Jet Perforation
1985-03-07 Well Log Performed
1985-03-09 Perforation Treatment Performed - Fractured
1985-03-09 Perforation Treatment Performed - Jet Perforation
1985-03-09 Well Log Performed
1985-06-01 Well Began Production
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Pumping
1989-07-01 Well Fluid changed to Crude Oil
1989-07-01 Well Mode changed to Suspended
1990-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-07 Plug Back Performed
1990-11-08 Perforation Treatment Performed - Jet Perforation
1990-11-08 Perforation Treatment Performed - Remedial Casing
1990-11-08 Well Abandoned
1990-11-08 Well Fluid changed to Crude Oil
1990-11-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-12 Perforation 1727.30 1730.30 13
1990-11-07 Packing Device Capped w/Cement 1650.00 1650.00 0
1990-11-08 Perforation 250.00 250.30 13
1990-11-08 Perforation 251.00 251.30 13
1990-11-08 Remedial Casing Cementing 250.00 251.30 0
1984-12-13 Acid Treatment 1727.30 1730.30 0
1984-12-15 Fracture 1727.30 1730.30 0
1985-02-26 Perforation 1727.30 1730.30 0
1985-03-07 Packing Device Capped w/Cement 1712.00 1720.00 0
1985-03-07 Perforation 1664.00 1667.00 13
1985-03-07 Fracture 1664.00 1667.00 0
1985-03-09 Perforation 1658.00 1661.00 13
1985-03-09 Fracture 1658.00 1661.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3302 0.0 0.0 0.0
1986 4858 0.0 0.0 0.0
1987 4026 0.0 0.0 0.0
1988 1229 0.0 0.0 0.0

For data sources see[5]

References