X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786080907002

Well Details

Well ID: 0786080907002
Loading map...
Location: 00/07-09-078-08W6/2
Location Alias: 00/07-09-78-08 W6M
Location Alias 2: 00/07-09-078-08 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 08
Section: 09
County/Municipality: Saddle Hills County
Well Name: WESTMIN ET AL PROGRESS 7-9-78-8
Operator Name: Nyrstar Myra Falls Ltd.
License Number: 0084097
License Date: 1980-07-11
License Status: RecCertified
Spud Date: 1980-07-17
Final Drill Date: 1980-08-03
Well Total Depth: 1685.00 m
Surface Hole Latitude: 55.742765
Surface Hole Longitude: -119.171247

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-11 Obtained License
1980-07-25 Drill Stem Test Performed
1980-08-03 Finished Drilling
1980-08-03 Well Log Performed
1980-08-03 Well Mode changed to Drilled and Cased
1980-08-05 Drill Stem Test Performed
1980-08-07 Production Casing Operation Performed
1980-08-17 Perforation Treatment Performed - Jet Perforation
1980-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-19 Perforation Treatment Performed - Cement Squeeze
1980-08-19 Perforation Treatment Performed - Jet Perforation
1980-08-21 Perforation Treatment Performed - Jet Perforation
1980-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-24 Perforation Treatment Performed - Fractured
1980-11-28 Well Began Production
1980-11-28 Well Fluid changed to Crude Oil
1980-11-28 Well Mode changed to Pumping
1981-06-26 Perforation Treatment Performed - Cement Squeeze
1981-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-30 Perforation Treatment Performed - Jet Perforation
1981-07-02 Perforation Treatment Performed - Fractured
1981-10-30 Perforation Treatment Performed - Fractured
1981-10-31 Well Fluid changed to Crude Oil
1981-10-31 Well Mode changed to Suspended
1988-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-10 Plug Back Performed
1988-07-10 Well Abandoned
1988-07-10 Well Fluid changed to Crude Oil
1988-07-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-17 Perforation 1652.00 1654.00 7
1981-06-30 Perforation 1596.50 1598.50 13
1981-06-30 Acid Treatment 1596.50 1598.50 0
1981-07-02 Fracture 1596.50 1598.50 0
1981-10-30 Fracture 1652.00 1654.00 0
1988-07-10 Packing Device Capped w/Cement 1638.00 1648.00 0
1988-07-10 Packing Device Capped w/Cement 1582.00 1590.00 0
1980-08-19 Perforation 1606.50 1607.00 14
1980-08-19 Acid Treatment 1606.50 1607.00 0
1980-08-19 Cement Squeeze 1606.50 1607.00 0
1980-08-21 Perforation 1596.50 1598.50 7
1980-08-21 Perforation 1601.00 1603.00 7
1980-08-22 Acid Treatment 1596.50 1603.00 0
1980-08-24 Fracture 1596.50 1603.00 0
1981-06-26 Cement Squeeze 1596.50 1603.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 888 0.0 0.0 0.0
1981 2904 0.0 0.0 0.0

For data sources see[5]

References