X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786080316000

Well Details

Well ID: 0786080316000
Loading map...
Location: 00/16-03-078-08W6/0
Location Alias: 00/16-03-78-08 W6M
Location Alias 2: 00/16-03-078-08 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 08
Section: 03
County/Municipality: Saddle Hills County
Well Name: KELT EXP VALHALLA 16-3-78-8
Operator Name: Kelt Exploration Ltd.
License Number: 0097090
License Date: 1982-08-19
License Status: Abandoned
Spud Date: 1982-08-23
Final Drill Date: 1982-08-31
Well Total Depth: 1682.00 m
Surface Hole Latitude: 55.734665
Surface Hole Longitude: -119.141656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-08-19 Obtained License
1982-08-31 Finished Drilling
1982-08-31 Well Mode changed to Drilled and Cased
1982-09-02 Drill Stem Test Performed
1982-09-03 Production Casing Operation Performed
1982-09-19 Perforation Treatment Performed - Jet Perforation
1982-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-24 Perforation Treatment Performed - Jet Perforation
1982-09-26 Perforation Treatment Performed - Fractured
1982-10-01 Well Began Production
1982-10-01 Well Fluid changed to Crude Oil
1982-10-01 Well Mode changed to Pumping
1989-07-01 Well Fluid changed to Crude Oil
1989-07-01 Well Mode changed to Suspended
1990-10-16 Well Fluid changed to Crude Oil
1990-10-16 Well Mode changed to Pumping
2000-11-30 Well Fluid changed to Crude Oil
2000-11-30 Well Mode changed to Suspended
2003-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-17 Plug Back Performed
2003-02-17 Well Fluid changed to Crude Oil
2003-02-17 Well Mode changed to Abandoned Zone
2003-02-20 Perforation Treatment Performed - Jet Perforation
2003-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-24 Perforation Treatment Performed - Jet Perforation
2003-02-26 Perforation Treatment Performed - Jet Perforation
2003-03-01 Perforation Treatment Performed - Fractured
2003-03-03 Perforation Treatment Performed - Jet Perforation
2003-03-05 Perforation Treatment Performed - Fractured
2003-12-12 Perforation Treatment Performed - Cement Squeeze
2003-12-12 Plug Back Performed
2003-12-13 Perforation Treatment Performed - Jet Perforation
2003-12-14 Perforation Treatment Performed - Remedial Casing
2003-12-15 Perforation Treatment Performed - Remedial Casing
2003-12-16 Perforation Treatment Performed - Jet Perforation
2003-12-18 Perforation Treatment Performed - Remedial Casing
2003-12-18 Plug Back Performed
2012-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-14 Plug Back Performed
2012-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-16 Plug Back Performed
2012-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-19 Perforation Treatment Performed - Jet Perforation
2012-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-20 Perforation Treatment Performed - Cement Squeeze
2012-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-22 Perforation Treatment Performed - Jet Perforation
2012-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-23 Perforation Treatment Performed - Cement Squeeze
2012-08-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-19 Perforation 1603.00 1604.50 7
2003-02-24 Perforation 1454.00 1465.50 17
2003-02-26 Perforation 1542.50 1546.50 17
2003-03-01 Fracture 1542.50 1546.50 0
2003-03-03 Perforation 1542.50 1546.50 17
2003-03-05 Fracture 1542.50 1546.50 0
2003-12-12 Cement Squeeze 1454.00 1465.50 0
2003-12-13 Perforation 865.00 867.00 20
2003-12-13 Perforation 499.00 501.00 20
2003-12-14 Remedial Casing Cementing 865.00 867.00 0
2003-12-15 Remedial Casing Cementing 499.00 501.00 0
1982-09-23 Packing Device Capped w/Cement 1601.90 1602.50 0
2003-12-16 Perforation 400.00 401.00 17
2003-12-18 Remedial Casing Cementing 400.00 401.00 0
2012-07-14 Packing Device Capped w/Cement 1520.70 1528.70 0
2012-07-16 Packing Device Capped w/Cement 1447.00 1455.00 0
2012-07-16 Packing Device Capped w/Cement 850.00 858.00 0
2012-07-16 Packing Device Capped w/Cement 275.00 506.00 0
2012-07-19 Perforation 32.00 303.00 13
2012-07-19 Packing Device Capped w/Cement 303.00 308.60 0
2012-07-20 Cement Squeeze 302.00 303.00 0
2012-07-20 Packing Device Capped w/Cement 284.00 292.00 0
1982-09-24 Perforation 1594.00 1596.00 13
2012-07-22 Perforation 238.00 239.00 13
2012-07-22 Packing Device Capped w/Cement 239.00 241.00 0
2012-07-23 Cement Squeeze 238.00 239.00 0
2012-07-23 Packing Device Capped w/Cement 225.00 234.00 0
1982-09-24 Perforation 1599.00 1600.00 13
1982-09-24 Acid Treatment 1594.00 1600.00 0
1982-09-26 Fracture 1594.00 1600.00 0
2003-02-17 Packing Device Capped w/Cement 1576.00 1584.00 0
2003-02-20 Perforation 1536.00 1537.00 17
2003-02-22 Acid Treatment 1536.00 1537.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1736 0.0 0.0 0.0
1983 974 0.0 0.0 0.0
1984 3409 0.0 0.0 0.0
1985 1174 0.0 0.0 0.0
1986 1283 0.0 0.0 0.0
1987 1610 0.0 0.0 0.0
1988 718 0.0 0.0 0.0
1990 1316 0.0 0.0 0.0
1991 5506 0.0 0.0 0.0
1992 6383 0.0 0.0 0.0
1993 5592 0.0 0.0 0.0
1994 3312 0.0 0.0 0.0
1999 1991 0.0 0.0 0.0
2000 4280 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References