X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786072116000

Well Details

Well ID: 0786072116000
Loading map...
Location: 00/16-21-078-07W6/0
Location Alias: 00/16-21-78-07 W6M
Location Alias 2: 00/16-21-078-07 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 07
Section: 21
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 16-21-78-7
Operator Name: Tourmaline Oil Corp.
License Number: 0475519
License Date: 2015-05-19
License Status: Suspension
Spud Date: 2015-09-18
Final Drill Date: 2015-09-27
Well Total Depth: 2850.00 m
Surface Hole Latitude: 55.766155
Surface Hole Longitude: -119.010017

For data sources see[1][2]

Well History

Date Event
2015-05-19 Obtained License
2015-09-19 Surface Casing Operation Performed
2015-09-20 Direction Drilling Operation Performed - Deviate
2015-09-22 Direction Drilling Operation Performed - Horizontal
2015-09-23 Intermediate Casing Operation Performed
2015-09-27 Finished Drilling
2015-09-27 Well Log Performed
2015-09-27 Well Mode changed to Drilled and Cased
2015-09-29 Liner Casing Operation Performed
2015-09-29 Rig Released
2015-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-15 Well Began Production
2015-10-15 Well Fluid changed to Crude Oil
2015-10-15 Well Mode changed to Pumping
2019-05-31 Well Fluid changed to Crude Oil
2019-05-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-18 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-20 1137.30 Deviate (5 - 79 degrees)
2015-09-22 1600.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-06 Multi-Stage Fracture 2821.90 2822.00 0
2015-10-09 Multi-Stage Fracture 2398.70 2398.80 0
2015-10-09 Multi-Stage Fracture 2353.30 2353.40 0
2015-10-09 Multi-Stage Fracture 2192.50 2192.60 0
2015-10-09 Multi-Stage Fracture 2147.10 2147.20 0
2015-10-09 Multi-Stage Fracture 2087.70 2087.80 0
2015-10-09 Multi-Stage Fracture 2042.60 2042.70 0
2015-10-09 Multi-Stage Fracture 1997.20 1997.30 0
2015-10-09 Multi-Stage Fracture 1937.70 1937.80 0
2015-10-09 Multi-Stage Fracture 1878.00 1878.10 0
2015-10-09 Multi-Stage Fracture 1819.40 1819.50 0
2015-10-06 Acid Treatment 2821.90 2822.00 0
2015-10-09 Multi-Stage Fracture 1775.10 1775.20 0
2015-10-09 Multi-Stage Fracture 1730.30 1730.40 0
2015-10-09 Multi-Stage Fracture 1685.10 1685.20 0
2015-10-09 Multi-Stage Fracture 2772.00 2772.10 0
2015-10-09 Multi-Stage Fracture 2681.70 2681.80 0
2015-10-09 Multi-Stage Fracture 2622.20 2622.30 0
2015-10-09 Multi-Stage Fracture 2577.80 2577.90 0
2015-10-09 Multi-Stage Fracture 2532.60 2532.70 0
2015-10-09 Multi-Stage Fracture 2487.30 2487.40 0
2015-10-09 Multi-Stage Fracture 2443.00 2443.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-06 2015-10-09 1,447 3,511 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 91.9748 N/A
Atlas CRC-LT (20/40) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 3.1537 N/A
Phenolic Resin 9003-35-4 100 3.1537 N/A
Sand (20/40) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.7966 N/A
Crystalline silica. quartz 14808-60-7 100 3.7966 N/A
Iron Oxide 1309-37-1 100 3.7966 N/A
Titanium Oxide 13463-67-7 100 3.7966 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 1.2054 N/A
Crystalline silica. quartz 14808-60-7 100 1.2054 N/A
Iron Oxide 1309-37-1 100 1.2054 N/A
Titanium Oxide 13463-67-7 100 1.2056 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.015 N/A
Water 7732-18-5 100 0.015 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.1027 N/A
CAN-2410 Demulsifier Canyon Technical Services Demulsifier Methyl Alcohol 67-56-1 100 0.0874 N/A
Water 7732-18-5 100 0.0874 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0522 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-05 2015-10-05 Surface Water - Runoff 331
2015-10-07 2015-10-07 Surface Water - Runoff 2770
2015-10-08 2015-10-08 Surface Water - Runoff 411

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 855 0.0 0.0 0.0
2016 5079 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-27 No Incident Encountered 0.00 0.00
2015-11-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References