X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786072016000

Well Details

Well ID: 0786072016000
Loading map...
Location: 00/16-20-078-07W6/0
Location Alias: 00/16-20-78-07 W6M
Location Alias 2: 00/16-20-078-07 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 07
Section: 20
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 16-20-78-7
Operator Name: Tourmaline Oil Corp.
License Number: 0470136
License Date: 2014-09-22
License Status: Issued
Spud Date: 2014-10-09
Final Drill Date: 2014-10-22
Well Total Depth: 3016.00 m
Surface Hole Latitude: 55.765830
Surface Hole Longitude: -119.032497

For data sources see[1][2]

Well History

Date Event
2014-09-22 Obtained License
2014-10-11 Surface Casing Operation Performed
2014-10-13 Direction Drilling Operation Performed - Deviate
2014-10-15 Direction Drilling Operation Performed - Horizontal
2014-10-17 Well Log Performed
2014-10-18 Intermediate Casing Operation Performed
2014-10-22 Finished Drilling
2014-10-22 Well Log Performed
2014-10-22 Well Mode changed to Drilled and Cased
2014-10-23 Well Log Performed
2014-10-24 Liner Casing Operation Performed
2014-10-24 Rig Released
2014-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-15 Well Began Production
2014-11-15 Well Fluid changed to Crude Oil
2014-11-15 Well Mode changed to Pumping
2016-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-09 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-13 1141.40 Deviate (5 - 79 degrees)
2014-10-15 1683.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-01 Multi-Stage Fracture 2984.20 2984.30 0
2014-11-04 Multi-Stage Fracture 2601.90 2602.00 0
2014-11-04 Multi-Stage Fracture 2559.10 2559.20 0
2014-11-04 Multi-Stage Fracture 2503.00 2503.10 0
2014-11-04 Multi-Stage Fracture 2460.20 2460.30 0
2014-11-04 Multi-Stage Fracture 2417.50 2417.60 0
2014-11-04 Multi-Stage Fracture 2361.40 2361.50 0
2014-11-04 Multi-Stage Fracture 2319.30 2319.40 0
2014-11-04 Multi-Stage Fracture 2264.10 2264.20 0
2014-11-04 Multi-Stage Fracture 2223.20 2223.30 0
2014-11-04 Multi-Stage Fracture 2167.00 2167.10 0
2014-11-01 Acid Treatment 2984.20 2984.30 0
2014-11-04 Multi-Stage Fracture 2124.30 2124.40 0
2014-11-04 Multi-Stage Fracture 2081.60 2081.70 0
2014-11-04 Multi-Stage Fracture 2025.50 2025.60 0
2014-11-04 Multi-Stage Fracture 1982.90 1983.00 0
2014-11-04 Multi-Stage Fracture 1926.90 1927.00 0
2014-11-04 Multi-Stage Fracture 1884.10 1884.20 0
2014-11-04 Multi-Stage Fracture 1841.40 1841.50 0
2014-11-04 Multi-Stage Fracture 1785.20 1785.30 0
2016-07-21 Acid Treatment 1785.20 2984.30 0
2014-11-03 Multi-Stage Fracture 2940.00 2940.10 0
2014-11-03 Multi-Stage Fracture 2897.90 2898.00 0
2014-11-03 Multi-Stage Fracture 2842.40 2842.50 0
2014-11-03 Multi-Stage Fracture 2799.70 2799.80 0
2014-11-03 Multi-Stage Fracture 2743.50 2743.60 0
2014-11-03 Multi-Stage Fracture 2700.60 2700.70 0
2014-11-03 Multi-Stage Fracture 2658.00 2658.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-01 2014-11-04 1,469 5,213 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 90.7253 N/A
Atlas CRC-LT (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 1.4115 N/A
Phenolic Resin 9003-35-4 100 1.4115 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 6.7565 N/A
Crystalline silica. quartz 14808-60-7 100 6.7565 N/A
Iron Oxide 1309-37-1 100 6.7565 N/A
Titanium Oxide 13463-67-7 100 6.7565 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.854 N/A
Crystalline silica. quartz 14808-60-7 100 0.854 N/A
Iron Oxide 1309-37-1 100 0.854 N/A
Titanium Oxide 13463-67-7 100 0.8541 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0134 N/A
Water 7732-18-5 100 0.0134 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0994 N/A
Water 7732-18-5 100 0.0994 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0503 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0892 N/A
Methanol 67-56-1 100 0.0892 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0892 N/A
Water 7732-18-5 100 0.0892 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-30 2014-11-04 Surface Water - Runoff 5213

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 748 0.0 0.0 0.0
2015 8067 0.0 0.0 0.0
2016 8072 0.0 0.0 0.0
2017 8109 0.0 0.0 0.0
2018 8659 0.0 0.0 0.0
2019 6050 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-22 No Incident Encountered 0.00 0.00
2014-11-18 No Incident Encountered 0.00 0.00
2016-07-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References