If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786070816020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.736863,"lon":-119.010659,"icon":""}]} |
Location: 02/16-08-078-07W6/0 | |
Location Alias: 02/16-08-78-07 W6M | |
Location Alias 2: 02/16-08-078-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 07 | |
Section: 08 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ 102 VALHALLA 16-8-78-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0476144 | |
License Date: 2015-07-17 | |
License Status: Issued | |
Spud Date: 2015-09-25 | |
Final Drill Date: 2015-10-07 | |
Well Total Depth: 3755.00 m | |
Surface Hole Latitude: 55.736863 | |
Surface Hole Longitude: -119.010659 |
Date | Event |
---|---|
2015-07-17 | Obtained License |
2015-09-27 | Surface Casing Operation Performed |
2015-09-28 | Direction Drilling Operation Performed - Deviate |
2015-10-01 | Direction Drilling Operation Performed - Horizontal |
2015-10-02 | Intermediate Casing Operation Performed |
2015-10-07 | Finished Drilling |
2015-10-07 | Well Log Performed |
2015-10-07 | Well Mode changed to Drilled and Cased |
2015-10-08 | Liner Casing Operation Performed |
2015-10-09 | Rig Released |
2015-10-28 | Well Log Performed |
2015-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-11-13 | Well Began Production |
2015-11-13 | Well Fluid changed to Crude Oil |
2015-11-13 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-25 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-09-28 | 1158.60 | Deviate (5 - 79 degrees) |
2015-10-01 | 1725.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-10-30 | Multi-Stage Fracture | 3740.00 | 3740.10 | 0 |
2015-11-03 | Multi-Stage Fracture | 3130.30 | 3130.40 | 0 |
2015-11-03 | Multi-Stage Fracture | 3057.80 | 3057.90 | 0 |
2015-11-03 | Multi-Stage Fracture | 2986.80 | 2986.90 | 0 |
2015-11-03 | Multi-Stage Fracture | 2913.90 | 2914.00 | 0 |
2015-11-03 | Multi-Stage Fracture | 2826.60 | 2826.70 | 0 |
2015-11-03 | Multi-Stage Fracture | 2753.50 | 2753.60 | 0 |
2015-11-03 | Multi-Stage Fracture | 2680.60 | 2680.70 | 0 |
2015-11-03 | Multi-Stage Fracture | 2607.30 | 2607.40 | 0 |
2015-11-04 | Multi-Stage Fracture | 2534.50 | 2534.60 | 0 |
2015-11-04 | Multi-Stage Fracture | 2461.90 | 2462.00 | 0 |
2015-10-30 | Acid Treatment | 3740.00 | 3740.10 | 0 |
2015-11-04 | Multi-Stage Fracture | 2375.00 | 2375.10 | 0 |
2015-11-04 | Multi-Stage Fracture | 2301.70 | 2301.80 | 0 |
2015-11-04 | Multi-Stage Fracture | 2228.50 | 2228.60 | 0 |
2015-11-04 | Multi-Stage Fracture | 2155.60 | 2155.70 | 0 |
2015-11-04 | Multi-Stage Fracture | 2082.90 | 2083.00 | 0 |
2015-11-04 | Multi-Stage Fracture | 1996.70 | 1996.80 | 0 |
2015-11-04 | Multi-Stage Fracture | 1923.50 | 1923.60 | 0 |
2015-11-04 | Multi-Stage Fracture | 1854.20 | 1854.30 | 0 |
2015-11-03 | Multi-Stage Fracture | 3667.30 | 3667.40 | 0 |
2015-11-03 | Multi-Stage Fracture | 3594.20 | 3594.30 | 0 |
2015-11-03 | Multi-Stage Fracture | 3507.00 | 3507.10 | 0 |
2015-11-03 | Multi-Stage Fracture | 3433.70 | 3433.80 | 0 |
2015-11-03 | Multi-Stage Fracture | 3361.20 | 3361.30 | 0 |
2015-11-03 | Multi-Stage Fracture | 3289.40 | 3289.50 | 0 |
2015-11-03 | Multi-Stage Fracture | 3216.50 | 3216.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-10-30 | 2015-11-04 | 1,496 | 4,159 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.3983 | N/A | |||
Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 4.9705 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.9705 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.9705 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.9705 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.114 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.114 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.114 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.1141 | N/A | ||||
SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.2635 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 4.2635 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0137 | N/A | |
Water | 7732-18-5 | 100 | 0.0137 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.1016 | N/A | |
CAN-2410 Demulsifier | Canyon Technical Services | Demulsifier | Methyl Alcohol | 67-56-1 | 100 | 0.0863 | N/A | |
Water | 7732-18-5 | 100 | 0.0863 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0517 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-10-28 | 2015-10-28 | Surface Water - Runoff | 674 |
2015-11-01 | 2015-11-01 | Surface Water - Runoff | 1317 |
2015-11-01 | 2015-11-01 | Surface Water - Runoff | 1318 |
2015-11-03 | 2015-11-03 | Surface Water - Runoff | 852 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 769 | 0.0 | 0.0 | 0.0 |
2016 | 8329 | 0.0 | 0.0 | 0.0 |
2017 | 8145 | 0.0 | 0.0 | 0.0 |
2018 | 8731 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-07 | No Incident Encountered | 0.00 | 0.00 |
2015-11-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]