X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786061804000

Well Details

Well ID: 0786061804000
Loading map...
Location: 00/04-18-078-06W6/0
Location Alias: 00/04-18-78-06 W6M
Location Alias 2: 00/04-18-078-06 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 06
Section: 18
County/Municipality: Municipal District of Spirit River No. 133
Well Name: ESSO ET AL SPIRITR 4-18-78-6
Operator Name: Imperial Oil Resources Limited
License Number: 0127255
License Date: 1987-07-09
License Status: Re-Entered
Spud Date: 1987-07-14
Final Drill Date: 1987-07-29
Well Total Depth: 1495.00 m
Surface Hole Latitude: 55.755483
Surface Hole Longitude: -118.925321

For data sources see[1][2]

Well History

Date Event
1987-07-09 Obtained License
1987-07-15 Surface Casing Operation Performed
1987-07-29 Finished Drilling
1987-07-29 Well Mode changed to Drilled and Cased
1987-07-30 Well Log Performed
1987-07-31 Drill Stem Test Performed
1987-08-02 Drill Stem Test Performed
1987-08-03 Production Casing Operation Performed
1987-08-03 Rig Released
1987-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-12 Perforation Treatment Performed - Jet Perforation
1987-08-12 Well Log Performed
1987-08-19 Perforation Treatment Performed - Fractured
1987-08-21 Well Log Performed
1987-08-28 Perforation Treatment Performed - Cement Squeeze
1987-08-28 Plug Back Performed
1987-08-29 Perforation Treatment Performed - Jet Perforation
1987-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-10 Perforation Treatment Performed - Fractured
1987-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-09-23 Plug Back Performed
1987-09-23 Well Log Performed
1987-09-23 Well Mode changed to Abandoned and Re-entered
1989-01-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-08-12 Perforation 1467.00 1469.50 13
1987-08-12 Acid Treatment 1467.00 1469.50 0
1987-08-19 Fracture 1467.00 1469.50 0
1987-08-28 Cement Squeeze 1467.00 1469.50 0
1987-08-29 Perforation 1445.50 1447.00 13
1987-08-31 Acid Treatment 1445.50 1447.00 0
1987-09-05 Acid Treatment 1445.50 1447.00 0
1987-09-10 Fracture 1445.50 1447.00 0
1987-09-23 Packing Device Capped w/Cement 1419.00 1429.00 0

For data sources see[4]



References