X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786060212003

Well Details

Well ID: 0786060212003
Loading map...
Location: 00/12-02-078-06W6/3
Location Alias: 00/12-02-78-06 W6M
Location Alias 2: 00/12-02-078-06 W6/03
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 06
Section: 02
County/Municipality: Municipal District of Spirit River No. 133
Well Name: PIONEER ET AL SPIRITR 12-2-78-6
Operator Name: TAQA North Ltd.
License Number: 0106169
License Date: 1984-02-24
License Status: RecCertified
Spud Date: 1984-05-05
Final Drill Date: 1984-05-11
Well Total Depth: 1457.00 m
Surface Hole Latitude: 55.733670
Surface Hole Longitude: -118.826714

For data sources see[1][2]

Well History

Date Event
1984-02-24 Obtained License
1984-05-11 Finished Drilling
1984-05-11 Well Log Performed
1984-05-11 Well Mode changed to Drilled and Cased
1984-05-12 Production Casing Operation Performed
1984-05-30 Perforation Treatment Performed - Jet Perforation
1984-05-30 Well Log Performed
1984-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-22 Perforation Treatment Performed - Jet Perforation
1984-06-22 Well Log Performed
1984-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-29 Perforation Treatment Performed - Cement Squeeze
1984-10-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-10-02 Well Log Performed
1984-10-04 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-10-11 Perforation Treatment Performed - Jet Perforation
1984-10-11 Well Log Performed
1986-02-14 Well Log Performed
1986-02-15 Well Log Performed
1986-02-17 Perforation Treatment Performed - Jet Perforation
1986-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-19 Plug Back Performed
1986-02-26 Well Began Production
1986-02-26 Well Fluid changed to Water
1986-02-26 Well Type changed to Source
1999-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-20 Plug Back Performed
1999-09-20 Well Fluid changed to Water
1999-09-20 Well Mode changed to Abandoned Zone
1999-09-20 Well Type changed to Source
2000-10-10 Well Abandoned
2000-10-10 Well Fluid changed to Water
2000-10-10 Well Mode changed to Abandoned
2000-10-10 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-05-30 Perforation 1421.00 1422.50 10
1984-10-04 Hydra Jet Perforation 1415.90 1416.00 0
1984-10-11 Perforation 1415.80 1416.30 13
1986-02-17 Perforation 762.00 789.50 13
1986-02-17 Perforation 753.00 755.00 13
1986-02-17 Perforation 746.00 747.50 13
1986-02-19 Acid Treatment 746.00 789.50 0
1986-02-19 Packing Device Capped w/Cement 1415.00 1416.30 0
1999-09-20 Packing Device Capped w/Cement 746.00 789.00 0
1984-05-30 Perforation 1418.50 1419.80 10
1984-05-30 Perforation 1410.50 1421.10 10
1984-05-30 Perforation 1408.50 1409.50 10
1984-05-31 Acid Treatment 1408.50 1422.50 0
1984-06-22 Perforation 1414.00 1416.50 10
1984-06-23 Acid Treatment 1408.50 1422.50 0
1984-09-29 Cement Squeeze 1408.50 1422.50 0
1984-10-02 Hydra Jet Perforation 1416.00 1416.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References