X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786030511000

Well Details

Well ID: 0786030511000
Loading map...
Location: 00/11-05-078-03W6/0
Location Alias: 00/11-05-78-03 W6M
Location Alias 2: 00/11-05-078-03 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 03
Section: 05
County/Municipality: Birch Hills County
Well Name: THUNDER BIRCHILL SHANE 11-5-78-3
Operator Name: Journey Energy Inc.
License Number: 0257347
License Date: 2001-07-12
License Status: Re-Entered
Spud Date: 2001-07-21
Final Drill Date: 2001-07-27
Well Total Depth: 1332.00 m
Surface Hole Latitude: 55.733305
Surface Hole Longitude: -118.432347

For data sources see[1][2]

Well History

Date Event
2001-07-12 Obtained License
2001-07-22 Surface Casing Operation Performed
2001-07-26 Well Log Performed
2001-07-27 Drill Stem Test Performed
2001-07-27 Finished Drilling
2001-07-28 Drill Stem Test Performed
2001-07-28 Well Log Performed
2001-07-29 Drill Stem Test Performed
2001-07-30 Production Casing Operation Performed
2001-07-30 Rig Released
2001-07-30 Well Mode changed to Drilled and Cased
2001-08-08 Perforation Treatment Performed - Jet Perforation
2001-08-08 Well Log Performed
2001-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-10 Perforation Treatment Performed - Jet Perforation
2001-08-10 Plug Back Performed
2001-08-10 Well Log Performed
2001-08-10 Well Mode changed to Abandoned Zone
2001-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-15 Perforation Treatment Performed - Fractured
2001-08-16 Well Log Performed
2001-08-17 Perforation Treatment Performed - Jet Perforation
2001-08-17 Well Log Performed
2001-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-22 Plug Back Performed
2001-08-22 Well Log Performed
2001-08-23 Perforation Treatment Performed - Jet Perforation
2001-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-27 Perforation Treatment Performed - Fractured
2001-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-04 Plug Back Performed
2001-09-04 Well Log Performed
2002-07-30 Well Log Performed
2002-08-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-08 Perforation 1225.00 1227.00 17
2001-08-22 Packing Device Capped w/Cement 1191.80 1199.80 0
2001-08-22 Packing Device Capped w/Cement 1095.80 1103.80 0
2001-08-23 Perforation 1077.00 1079.00 17
2001-08-23 Perforation 1083.00 1086.00 17
2001-08-25 Acid Treatment 1077.00 1086.00 0
2001-08-27 Fracture 1077.00 1079.00 0
2001-08-27 Fracture 1083.00 1086.00 0
2001-09-04 Packing Device Capped w/Cement 1051.80 1063.80 0
2001-08-09 Acid Treatment 1225.00 1227.00 0
2001-08-10 Packing Device Capped w/Cement 1221.00 1227.00 0
2001-08-10 Perforation 1211.50 1213.00 17
2001-08-11 Acid Treatment 1211.50 1213.00 0
2001-08-15 Fracture 1211.50 1213.00 0
2001-08-17 Perforation 1108.00 1110.00 17
2001-08-17 Perforation 1112.00 1113.50 17
2001-08-17 Perforation 1116.00 1119.00 17

For data sources see[4]



References